Similar Projects
Demolition and Removal of the 7 Normand Avenue Building
Demolition
Bidding
Sanford, ME 04073

Demolition, Removal, and Site Cleanup
Demolition
Post-Bid
Baileyville, ME 04694

Demolition of a Town Owned Building
Demolition
Post-Bid
Mars Hill, ME

Demolition, Debris Removal and Site Grade Restoration
Results
Casco, ME

Downtown Building Demolition
Demolition
Results
Madawaska, ME

Dismantle, Transport, and Disposal of a Submarine Support Facility (SSF)
Post-Bid
Kittery, ME 03904

Demolition of the Structure at 12 Fair Street
Demolition
Results
Lewiston, ME

115 South Street Demolition Project
Demolition
Post-Bid
Farmington, ME 04938

Building Demolition and Removal/Located at 3 Wakefield Road
Results
Hollis, ME

Modular Structure Removal
Post-Bid
Kittery, ME

House Demolition and Removal
Demolition
Results
Union, ME

Mt. Ararat High School - Abatement and Demolition
Demolition
Post-Bid
$300,000 to $1,500,000 est. value
Topsham, ME 04086

Demolition and Removal of the 93 Lebanon Street Buildings - Phase I
Demolition
Results
Sanford, ME 04073

112 Maguire Street Demolition
Demolition
Post-Bid
Farmington, ME 04938

Old Central Office Demolition
Demolition
Results
Dixfield, ME

Last Updated 02/20/2019 09:18 AM
Project Title

Demolition and Soil Removal at 58 Boyd Street

Physical Address View project details and contacts
City, State (County) Portland, ME   (Cumberland County)
Category(s) Heavy and Highway
Sub-Category(s) Demolition
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description Demolition of the Site building in accordance with applicable local and state regulations; dewatering, stormwater and groundwater management; excavation and proper off-site disposal of approximately 2,000 cubic yards (3,000 tons) of urban fill (special waste) soils; Site re-grading; and construction of a stormwater collection system consisting of a stormwater diversion berm, stormwater field inlet (riprap swale), approximately 125 linear feet of 12-inch diameter HDPE pipe, and 4-foot diameter precast concrete drain manhole.
Details
Division 02 - Existing Conditions, Demolition.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents