Similar Projects
Repair HVAC/Electrical Infrastructure - B317
Design
$500,000 to $1,000,000 est. value
Niagara Falls, NY

Operations Generator Maintenance Program
Post-Bid
Niagara Falls, NY

Emergency Generator Routine Maintenance and Repairs
Term Contract
Post-Bid
Lockport, NY 14094

High Voltage, Service, Switchgear Inspection and Emergency Electrical Work
Term Contract
Results
Niagara Falls, NY 14304

Job Order Contracting - Area 7
Results
$500,000 to $1,000,000 est. value

Distribution Panels
Post-Bid
Lewiston, NY 14092

Copper Plant Upgrade
Results
$500,000 to $1,000,000 est. value
NY 14304

Large Scale Renewables
Post-Bid

Auditorium Light Replacement
Results
Lockport, NY 14094

Led Price Sign Fabrication & Installation At Twenty-Four (24) Lna Service Stations
Post-Bid

F/D Two Auto-Transformers for NIA T-LEM Project
Term Contract
Post-Bid
Lewiston, NY

Sedimentation Basins and Scum Collection System Modifications - Electrical Package
Post-Bid
Niagara Falls, NY 14304

HVAC Electrical Renovations
Post-Bid
Niagara Falls, NY 14303

Furnish and Deliver 600V Power and Control Cable required for the Niagara Transmission Life Extension and Modernization (TLEM) Program
Term Contract
Post-Bid
NY

LED Price Signs Fabrication & Installation-NJ, NY & PA
Renovation
Post-Bid

Reported 08/11/2021 12:00 AM
Project Title

Electrical 100 AMP Sub-Panel Office Building Installation

Physical Address View project details and contacts
City, State (County) Niagara Falls, NY 14304   (Niagara County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Electrical 100 Amp Sub-Panel Office Building Installation: - Install a 100amp subpanel from the main 120/208 panel in building 912 at Niagara Falls Air Reserve Station - Install ten (10) 20amp, 125 volt dedicated circuits from the newly installed 100amp subpanel. - Eight (8) of these circuits will be installed in room 113b and two (circuits) will be installed in the storage closet. - The contractor will provide power to the subpanel and the dedicated circuits. - Fifteen (15) additional conduit runs will be provided for communications infrastructure alongside electrical conduit.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents