Similar Projects
Constructing the Bridge Replacements Grading, Drainage, Pavement, and Bridge
New Construction, Infrastructure
Bidding
$7,317,335 to $8,943,410 est. value
AL

Constructing the Bridge Replacements and Approaches on CR-17 over Mulberry Creek
New Construction, Infrastructure
Bidding
$1,875,014 to $2,291,683 est. value
AL

Bridge Repairs on County Road 85 over Cypress Creek
Post-Bid
Florence, AL 35630

Bridge Street Town Center
Renovation
Post-Bid
Huntsville, AL 35805

Bridge Replacement on Fairview Cove
Results
Gadsden, AL 35901

Bridge Replacement (Grading, Drainage, Pavement, and Bridge) on SR-68 Over the Abandoned tag Railroad 0.500 Mile North of the Junction of SR-273 in Leesburg
Results
$3,019,911 to $3,691,002 est. value
AL

Aerial Bridge Crossing Project
New Construction, Infrastructure
Bidding
Huntsville, AL

Pedestrian Bridge Over Water Street, Bin 17197 Repair and Repainting
Post-Bid
Mobile, AL

Bridge Superstructure Replacement on Carriger Road Over Flint River
Results
Huntsville, AL 35801

Sunset Road - Bridge Replacement (Structure 215)
Post-Bid
Mobile, AL

Constructing the Bridge Replacement on CR-22 (Deans Ferry Road) over the CSX Railroad South of Hayden
Results
$881,586 to $1,077,494 est. value
AL

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Constructing the Bridge Replacement and approaches on CR-50 over Muscadine Creek
Results
$498,630 to $609,437 est. value
AL

Bidder Pre-Qualifications - AltaPointe Health Systems Inc.
New Construction
Post-Bid
Mobile, AL 36608

Constructing the Bridge Scour Countermeasure and Guardrail Installations on CR-165 Over Williams Creek (Site 1) and Over Old Town Creek (Site 2)
Results
$276,978 to $338,529 est. value
AL

Last Updated 06/21/2021 10:35 AM
Project Title

Remove Timber Deck and Deck Supports on Existing Bridge

Physical Address View project details and contacts
City, State (County) Montgomery, AL 36117   (Montgomery County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $45,000 to $65,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove timber deck and deck supports on existing bridge and install new stamped concrete deck.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents