Similar Projects
High School Parking Lot Repair and Repaving
Bidding
Reading, PA 19605

Bituminous Seal Coat Superpave Wearing Course
Bidding
Reading, PA

2020 Roadwork Projects
Post-Bid
Fleetwood, PA 19522

Bituminous Paving and Final Surface Restoration of Trenches
Post-Bid
Laureldale, Muhlenberg Township, PA

2019 Annual Road Project Bituminous Seal Coat
Results
Hamburg, PA 19526

Double Bituminous Seal Coat
Results
$65,000 est. value
Bernville, PA 19506

2021 Streets Construction Project
Bidding
Sinking Spring, PA 19608

2021 Roadwork Projects
Post-Bid
Sinking Spring, PA 19608

Airport Road Rec Area Improvement Project
Results
$60,000 est. value
Bethel, PA 19507

Single Bituminous Seal Coat
Bidding
Lenhartsville, PA

Upper Tulpehocken Acess Raod Maintenance Project - Phase 1 SGL #110
Post-Bid
Bernville, PA

2019 Road Improvement Project
Results
$156,000 est. value
Leesport, PA 19533

Shoulder Work
Bidding
Bernville, PA

Superpave
Post-Bid
Fleetwood, PA

General Construction Work for Wilson High School - Lower House Paving Project
Results
Reading, PA 19609

Last Updated 01/26/2021 03:15 PM
Project Title

Blue Marsh Lake Road Repairs and Repaving

Physical Address View project details and contacts
City, State (County) Leesport, PA 19533   (Berks County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 to $5,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The U.S. Army Corps of Engineers, Philadelphia District, intends to award a firm fixed contract for work that consists of construction of road and parking lot repaving at the Blue Marsh Lake Dry Brooks Day Use Recreational Area. Description of Work: The Dry Brooks Day Use Area access road is approximately 6500 feet long, providing primary access to several parking lots for picnic areas, a swimming beach and rest rooms. Approximately 27,000 Square Yards (SY) of access road and parking areas under the base contract will be milled and repaved. Approximately 10,500 SY of additional parking and turn-around areas may be completed under three possible options depending on availability of funds. The purpose of this project is to reconstruct various sections of distressed asphalt concrete pavement, which is well beyond its service life. Reconstruction will typically involve demolition of the existing asphalt pavement by milling, preparing the existing aggregate base course, replacing any unstable subgrade areas, shoulder widening in a few areas, and placement of 4 inches of new hot mix asphalt pavement. A pavement drainage layer will also be added to the full pavement section in three localized areas exhibiting excessive damage. Pavement striping will be replaced in-kind. There is one culvert that will be extended due to shoulder extension to accommodate a wider pavement area in a location where vehicles currently drive on shoulder. The existing 18" corrugated metal pipe (CMP) requires an 8 foot extension and new end section. There is a requirement for a 6" aggregate bedding and a 12" minimum of backfill cover over the extended pipe.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents