Similar Projects
Athletics Control Room Replay System Replacement
Alteration
Bidding
$250,000 est. value
Iowa City, IA

Traffic Signal Improvements - Equipment Installation
Alteration
Bidding
Le Claire, IA

Information Technology Services
Term Contract
Post-Bid
Waterloo, IA 50703

Burlington Community Schools - Camera Upgrades
Alteration
Post-Bid
Burlington, IA 52601

ImOn Ice Arena Audio System Replacement
Alteration
Results
$325,000 est. value
Cedar Rapids, IA 52404

Digital Enterprise Conduit Deployment Segment 4 Phase 1
Alteration
Results
West Des Moines, IA

Pinecrest Building Audio and Visual Equipment and Installation Project
Alteration
Bidding
$90,000 est. value
Waterloo, IA 50703

Radio Frequency Identification System- RFID
Alteration
Post-Bid
Less than $75,000 est. value
Pella, IA

Fiber Conduit Inter-Connect (Pink Route - Phase 1)
Alteration
Results
West Des Moines, IA

Materials for Network Infrastructure Upgrade
Alteration
Post-Bid
Davenport, IA

Fiber Conduit Inter-Connect (Orange Route - Phase 2)
Alteration
Results
West Des Moines, IA

Provide, Install, and Maintain a 10Gb Ethernet Installation
Term Contract
Post-Bid
Des Moines, IA - Offutt Air Force Base, NE 50321

Digital Enterprise Last Mile Conduit Deployment Segment 1 Phase 1
Alteration
Results
Des Moines, IA

Camp Dodge T-22 Training Area Fiber
Alteration
Post-Bid
Johnston, IA

Digital Enterprise Conduit Deployment 2021 Multi-Family and Non-Residential Drop Installation Phase 2
Alteration
Results
Des Moines, IA

Last Updated 07/20/2022 12:29 AM
Project Title

Utilities - Pearson Substation-13.8KV Feeder Cable Replacement

Physical Address View project details and contacts
City, State (County) Ames, IA   (Story County)
Category(s) Single Trades
Sub-Category(s) Security/Communications
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $310,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of, but is not limited to, removal and replacement of 13,800V cable in existing conduits between underground vaults and above ground switchgear, cable splices in existing underground vaults, and cable terminations in above ground switchgear. Perform hi-pot cable tests on installed cable, splices, and terminations. Questions regarding the scope of work should be directed to Travis Van Dyke of ISU - Utilities, Phone: 515-294-2257, E-mail: tjvandyk@iastate.edu. This project will provide new high voltage electrical cabling, splices, and terminations in existing conduit between multiple underground vaults and above ground switchgear on the ISU Campus. Perform hi-pot testing on all new finished cabling installations.

Details

Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents