Similar Projects
DFCM Construction-Standard Low Bid-SUU JL Sorenson PE Bldg. Locker Room Safety/Code Upgrade
Renovation
Bidding
$386,392 est. value
Cedar City, UT

Discover Restroom Refresh
Renovation
Post-Bid
Salt Lake City, UT 84120

Construction of a Complete Restroom Building
Post-Bid
Hyde Park, UT 84318

Z--(S) (660) Rest Room Restoration (Va-19-00020667)
Renovation - 5,019 SF
Results
$25,000 to $100,000 est. value
Salt Lake City, UT 84148

Copperview Recreation Center Restrooms Remodel
Renovation
Results
$250,000 to $300,000 est. value
Midvale, UT 84047

Costco Dry Depot Additon #594
Addition - 56,700 SF
Construction
$4,300,000 est. value
Salt Lake City, UT 84104

Camp Williams Buildings 4101/4141 Restrooms Remodel
Renovation
Construction
Less than $600,000 est. value
Riverton, UT

Riverton Spa
New Construction - 6,479 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Riverton, UT 84065

Vault Toilets Zion National Park
New Construction
Post-Bid
$250,000 to $500,000 est. value

Swiss Pioneer Memorial Park
Results
Less than $495,000 est. value
Santa Clara, UT 84765

Family History Library Main Level Restroom
Renovation - 27,263 SF
Construction
$300,000 est. value
Salt Lake City, UT 84150

Beaver, Hampton Ford Ward Restroom Remodel
Renovation - 112 SF
Post-Bid
Logan, UT 84306

Independence Plat K Park - Restroom
Results
Bluffdale, UT 84065

DFCM Construction-Bear Lake SP Rendezvous Beach Restroom Improvement
Construction
$1,200,000 est. value
Laketown, UT 84038

Fairgrounds Restrooms Project
Post-Bid
UT

Last Updated 08/27/2020 06:09 PM
Project Title

DFCM Construction-UDOT Bear Lake Rest Area Improvements

Physical Address View project details and contacts
City, State (County) Laketown, UT   (Rich County)
Category(s) Entertainment/Recreation
Sub-Category(s) Restroom/Bath House
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $850,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Construction of new restroom, well house, and storage buildings along with utility connections. Finished restroom building to include men’s, women’s and family restrooms, storage rooms, and large entry way. Well house to include single well room. Storage building to included single storage room. Construction includes concrete stem walls with slab on grade foundation, CMU masonry and wood framed walls, and wood truss roof system with metal roof. Connections to existing main utility lines. Construct Work to allow for review of all trenching and excavation, concrete and masonry work, and piping prior to back filling or other work that would prevent a complete visual inspection by Code Officials.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 09 - Finishes, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Exterior Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents