Similar Projects
HCH Vault 4 Linac Replacement - Concrete
Alteration
Bidding
$425,000 est. value
Salt Lake City, UT 84103

Park Building Basement Structural Repairs
Post-Bid
Less than $500,000 est. value
Salt Lake City, UT 84112

Concrete Work
Term Contract
Post-Bid

2020 Murray City Concrete Repair
Results
Less than $977,030 est. value
Murray, UT 84107

2020 Murray City Concrete Repair Contract
Term Contract
Results
Less than $977,030 est. value
Murray, UT 84107

Installation, Upgrade, or Repair of Concrete Services- Stage 1
Term Contract
Post-Bid

Concrete Installation and Repair
Term Contract
Results
Sandy, UT 84070

Concrete Ready Mix - 2020
Post-Bid
Granite, Sandy, UT 84070

CAB - Concrete Repair and EIFS Replacement
Results
Less than $180,000 est. value
Sandy, UT 84070

On-Call Task Order Concrete Cutting Services
Post-Bid
Less than $54,306 est. value
Salt Lake City, UT 84114

Annual Contract for Concrete Cutting and Hole Boring
Term Contract
Results
Salt Lake City, UT 84115

Ready Mix Concrete
Term Contract
Post-Bid
Salt Lake City, UT 84190

Well Cementing and Pumping Services for Forge
Results
Salt Lake City, UT

Qta Traffic Coating Replacement
Post-Bid
Salt Lake City, UT

Remove and Install Concrete at Various Areas of Lee Kay Public Shooting Range Phase II
Results
Salt Lake City, UT 84128

Last Updated 05/26/2021 09:40 AM
Project Title

Concrete Demolition - Installation - Repair

Physical Address View project details and contacts
City, State (County) UT   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) Concrete
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope of Work A. Concrete Specifications 1. 4000 PSI exterior concrete (4% - 6% air entrained; Straight Bag Mix) 2. 4” Crushed Rock or Engineered Fill (compacted) 3. 4” – 12” thick concrete (with reinforced when needed) 4. Engineered fill will be placed in 6” lifts and compacted to 95% 5. Sealer (100% acrylic) 6. Broom finish 7. Relief cuts to match existing areas at the location (every 100 square feet max; no more than 10’ in any direction to the next relief joint) 8. Expansion joints every 50’ (or where abutting existing concrete) 9. 1/2” asphalt impregnated board 10. Excavation, haul-off, and forming included 11. Concrete install includes doweling into the abutting concrete 2’ on center with #4 bar x 16” B. General Specifications 1. All work shall meet all adopted building codes. 2. Inspections are required and will need to be coordinated through the CSD Facility Coordinator. 3. Daily and final clean-up will be the contractor’s responsibility. 4. Work may be scheduled during the day, but each project will need to be scheduled and completed with minimal impact on the school. 5. No concrete trucks are allowed on playgrounds during school hours. 6. Contractor is responsible for any vandalism of concrete until cured. 7. Any sprinkler lines damaged are the responsibility of the contractor. 8. Projects will need to be completed within four (4) weeks from the PO issue date. C. Work Performed Of the total work performed and completed annually, CSD anticipates that a majority of services fall under these key points: 1. Labor (Include in the Service) 2. Mobilization (Only for loads less than 400 sqft per site location) 3. 4” Slab Install 4. 4" Concrete Slab Install (reinforced #5 18"x18") 5. 4” Concrete Removal 6. 4” Concrete Removal (reinforced) 7. 6” Concrete Slab Install 8. 6” Concrete Slab Install (reinforced #5 18”x18”) 9. 6” Concrete Removal 10. 6” Concrete Removal (reinforced) 11. 8” Concrete Slab Install (reinforced #5 18”x18”) 12. 8” Concrete Removal (reinforced) 13. 12” Concrete Slab Install (reinforced #5 18”x18”) 14. 12” Concrete Removal (reinforced) 15. Curb & Gutter Install 16. Curb & Gutter Removal 17. Curb Wall Install 0-12” 18. High Early Concrete (quick curing) 19. Winterized Concrete (Chemical and Blankets Included) 20. Concrete Blanket 21. Pump Charge 22. Concrete Cutting 23. Landscape Removal (Needs to Include 6" 3/4 Crushed Rock or Engineered Fill) 24. Furnish and Install a Painted Bollard 25. ADA Ramp Install with Flares (typical curb height) 26. Sealer 100% Acrylic

Details

Division 02 - Existing Conditions, Demolition.
Division 03 - Concrete, Cast-in-Place Concrete.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents