Similar Projects
Brickell World Plaza - Phase 2b & 2c
New Construction
Conception
$10,000,000 CJ est. value
Miami, FL

Pointe at Princeton
New Construction - 376,165 SF
Conception
$10,000,000 CJ est. value
Princeton, FL

Resorts World Miami
New Construction, Renovation
Design
Miami, FL 33132

Miami Riverside Center
New Construction - 6,000,000 SF
Design
$80,000,000 est. value
Miami, FL

PHCD Work-Order Contract 2021 - Central Area
Bidding
$2,175,000 est. value
Miami, FL 33125

Aventura Crossings
New Construction - 599,282 SF
Post-Bid
$10,000,000 CJ est. value
Miami, FL 33180

Peters Plaza Elevator Replacement
Post-Bid
Less than $500,000 est. value
Miami, FL 33138

Neptune Apartments Exterior Rehabilitation
Results
Less than $550,000 est. value
Miami Beach, FL 33139

Phcd Vacant Unit Prep - Contract 1-North Sector
Results
Less than $3,000,000 est. value
Miami, FL

The Plaza Coral Gables
New Construction - 2,120,000 SF
Construction
$100,000,000 est. value
Coral Gables, FL 33134

River Landing Shops and Residences
New Construction - 1,600,000 SF
Construction
$425,000,000 est. value
Hialeah, Miami, FL 33010

Polish American Mixed-Use
New Construction - 350,026 SF
Conception
$10,000,000 CJ est. value
Miami, FL

One River Point
New Construction - 1,200,539 SF
Design
$210,094,235 est. value
Miami, FL

Development of Property at Vizcaya Station
Post-Bid
Miami, FL 331281

VCA/ADA Improvement to Common Areas and Laundry Rooms
Renovation
Results
Hialeah, FL 33010

Last Updated 05/05/2020 11:20 AM
Project Title

Phcd Vacant Unit Prep - Contract 2 -South Sector

Physical Address View project details and contacts
City, State (County) FL   (Miami-Dade County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The following are, at a minimum, the steps to preparing a vacant unit: Pre-Clean entire unit thoroughly with water & disinfectant cleaner (i.e. bathroom area, kitchen cabinets / area, windows and sills, light fixtures and globes and outlets and switches, waterheater and closet) Carpentry: Repair and or replace for new, the following: All shelving, doors and jambs, cabinets, countertops, locks, door stoppers, weather-stripping, door sweeps, window locks, window balances, window glass, window screening, Exterior security screen repairs and or replacement, floor tiling and baseboard replacement, if still in good shape, strip floors and baseboards with floor stripper and then wax floors with 3 coats of floor finish Plumbing: Repair and or Replace for new, the following: All faucets , space heaters, sinks, shower diverters, p-traps, angle valves, water-heaters, water pressure, toilets, toilet seats and toilet tanks replacements, install toilet paper holders, towel bar holders, exterior hose-Bibbs, showerheads, clean-outs, proper drainage at the bathtubs, washing machine drains, kitchen & lavatory sink drain, all stoppers to be installed @ the Kitchen sinks, lavatory sinks, bathtubs and washing machine drain plug Electrical systems: Repair and or Replace for new, the following: All light fixtures, outlets, GFCI’s, range-hoods, light bulbs – fluorescent and incandescent types, space heaters, electrical panel requires labeling, any wiring, Fuse boxes (fuses and or breakers included), thermostats, junction boxes for and to any central A/C System. Plaster: Repair and or Replace for new, the following: plaster walls to match existing if needs be with won-cote plaster or gypsum plaster, replace any broken ceramic holders and tiles in bath area, replace any drywall that is weak and or missing to match existing, plaster around window sills, grout tiles, flooring, around the toilet and tub areas in the bath, remove all nails and screws to plaster all holes throughout the unit, caulk around baseboards, cabinets, window

Details

Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating, Painting.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents