Last Updated | 07/25/2023 08:17 AM |
Project Title | I-294 Roadway and Bridge Reconstruction and Widening |
Physical Address | View project details and contacts |
City, State (County) | Chicago, IL 60652 (Cook County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Bridge, Maintenance, Paving/Reconstruction, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected October 2022 |
Bids Due | View project details and contacts |
Estimated Value | $129,921,626 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | CONTRACT 1-21-4834 - TRI-STATE TOLLWAY (I-294) ROADWAY AND BRIDGE RECONSTRUCTION AND WIDENING OGDEN AVENUE TO CERMAK ROAD The work to be done under this contract shall be started on or about October 17, 2022. All work under this contract shall be completed by November 25, 2025. The location of services to be performed is on the Tri-State Tollway (I-294) between Mile Post 27.8 and Mile Post 29.5 in Cook County, Illinois. The scope of work shall include, but is not limited to: mainline pavement removal, reconstruction and widening, reconstruction of mainline bridges over Salt Creek (BN 267 and 268), slope wall modification at the west abutment of 31st Street (BN 269), stain concrete parapets, piers and abutments on 31st Street (BN 269), stain concrete parapets, piers and abutments on Cermak Bridge (BN 203), retaining walls, noise abatement walls, intelligent transportation facilities (ITS), overhead sign structures, removal and replacement of guardrail, barrier wall and attenuators, erosion control and landscaping, drainage, lighting and maintenance of traffic The improvements to be constructed under this contract shall be performed along the Tri-State Tollway (I-294) between Mile Post 27.8 and Mile Post 29.5 in Cook County, Illinois. The work under this contract includes, but is not limited to: 1.) Mainline pavement removal reconstruction and widening. 2.) Reconstruction of Mainline bridges over Salt Creek (BN 267 and 268) 3.) Slope Wall Modification at the west abutment of 31st Street (BN 269) 4.) Stain concrete parapets, piers and abutments on 31st Street (BN 269) 5.) Stain concrete parapets, piers and abutments on Cermak Bridge (BN 203) 6.) Retaining walls 7.) Noise abatement walls 8.) Intelligent transportation facilities (ITS) 9.) Overhead sign structures. 10.) Removal and replacement of guardrail, barrier wall and attenuators. 11.) Erosion Control and Landscaping 12.) Lighting 13.) Maintenance of Traffic 14.) All other appurtenant and miscellaneous construction shown on the plans and as required by the Standard Specifications and within these special provisions. Audio conference: To receive a call back, provide your phone number when you join the event, or call the number below and enter the access code. US Toll +1-415-655-0003 Access code: 2457 208 0002 Questions pertaining to the intent of the contract documents may be sent to the Illinois Tollway, attention 4265D.4834_Questions@docs.e-builder.net, to be received no later than 2:00 p.m. local time on June 17, 2022. |
||||||||||||||||||||||
Details |
|
||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |