Similar Projects
Z--Hofu Upgrade HVAC ,Paint & ore Museum Collection
Design
$1,000,000 to $5,000,000 est. value
Elverson, PA

H241--Exhaust Hood Cleaning
Bidding
Coatesville, PA 19320

J--Cooler Tower Cleaning Coatesville VAMC
Post-Bid
Coatesville, PA 19320

Z2DA--D/B Renovate SPS 542-21-206
Renovation
Post-Bid
$500,000 to $1,000,000 est. value
Coatesville, PA 19320

A/C Upgrade at Devon Elementary School
Results
Wayne, PA 19087

A/C Upgrade at New Eagle Elementary School
Results
Wayne, PA 19087

Rehabilitation of Building 19, Frick`s Lock Village Trailhead – Schuylkill River Trail - HVAC
Post-Bid
Pottstown, PA 19464

Ambulance Bay & Interior Renovations - HVAC/Mechanical
Results
West Brandywine Township, PA

HVAC Renovations and Upgrades
Post-Bid
Berwyn, Devon, Wayne, PA 19312

Maintenance for Fire Extinguishers and Kitchen Hood Systems
Term Contract
Results
West Chester, PA 19383

HVAC and Mechanical Products
Term Contract
Post-Bid

Multi-Purpose Room RTU Replacement at the East Goshen Elementary School Mechanical Contract
Results
Exton, PA 19341

J041--Exhaust Hood Cleaning
Post-Bid
Coatesville, PA 19320

Chiller Plant Replacement at Owen J. Roberts High School
Results
Pottstown, PA 19464

Boiler Replacement
Renovation
Post-Bid
Pottstown, PA

Last Updated 12/30/2020 04:31 PM
Project Title

A/C Upgrade at Beaumont Elementary School and & Valley Forge Elementary School

Physical Address View project details and contacts
City, State (County) Berwyn, Wayne, PA 19312   (Chester County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A/C Upgrade at Beaumont Elementary School and 2) A/C Upgrade at Valley Forge Elementary School. Both projects consist of providing and installing new mechanical equipment in various locations at each school for air conditioning of the existing buildings. Mechanical Construction contract includes new condensing units for existing unit ventilators, new roof top units with ductwork, new mini-split systems, new bi-polar ionization units for installation in new and existing HVAC equipment, and new HVAC web-based control systems. Electrical Construction contract includes new electrical service upgrade with new MDP, new power distribution for new electrical panels, branch circuit power for all new HVAC systems and modification to fire alarm systems. General Construction contract includes roof curbs, equipment supports, structural reinforcing of roof, concrete pads with gates/fencing, and ceiling modifications for the running of ductwork, condensate lines, and electrical infrastructure. In addition, the Electrical Construction contract at Beaumont Elementary School includes with new medium voltage switch and transformer. General Mechanical Electrical

Details

Division 11 - Equipment, Operation and Maintenance of Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents