Similar Projects
Range Road Repave Law Enforcement Training Center
Infrastructure
Bidding
Waunakee, WI 53597

West Clover Lane Road Improvements
Infrastructure
Bidding
Cottage Grove, WI 53527

Traffic Calming Improvements
Renovation
Post-Bid
Less than $535,000 est. value
Fitchburg, WI 53575

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Nine Springs Valley Interceptor Improvements - McKee Road to Dunn`s Marsh
Results
Fitchburg, Madison, WI 53719

Seal Coating for Local Roads
Infrastructure
Bidding
Deforest, WI

2021 Road Work on North Road
Post-Bid
Blue Mounds, WI

Crack Routing and Sealing
Results
Madison, WI 53703

2021 Road Improvements
Infrastructure
Bidding
De Forest, WI 53532

Road Improvements Chip and Crack Seal
Post-Bid
Windsor, WI 53598

I-39 - Columbus, North Street to School Street
Results
Columbus, WI 53925

Edgerton South Main Street Improvements
Infrastructure
Bidding
Edgerton, WI

2021 Road Improvements - Pulverize and Overlay
Post-Bid
DeForest, Middleton, Morrisonville, WI 53562

Madison - Cambridge, Whitney Way to IH 39/90
Results
Cambridge, Madison, WI 53558

Last Updated 05/21/2021 09:45 AM
Project Title

Roadway and Parking Lot Repairs Phase 1

Physical Address View project details and contacts
City, State (County) Madison, WI   (Dane County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,250,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work consists of the installation of approximately 19,500 square yards of asphalt parking lot and roadway. The majority of the existing asphalt pavement is to be pulverized and regraded prior to paving. Reinforced concrete pavement, sidewalk, and curb installations are also required at various locations. Parking lot and roadway pavement marking is required. New storm sewer piping and structures will be provided at several locations to improve drainage. Project work areas are located inside and outside of the secure perimeter fencing.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents