Similar Projects
OR DOT 140(1), Klamath County Boat Marina to Lakeshore Drive
Infrastructure, Alteration
Design
$20,000,000 est. value
Klamath Falls, OR 97601

Swan Lake Energy Storage
New Construction, Infrastructure
Design
$800,000,000 CJ est. value
Pine Grove, OR 97603

L. Lily New Test Well
Infrastructure
Bidding
$100,000 CJ est. value
Chiloquin, OR 97624

City of Malin Municipal Well Construction
Infrastructure
Bidding
$200,000 CJ est. value
Malin, OR 97632

Runway 8/26 Reconstruction, Crater Lake - Klamath Regional Airport
Alteration
Post-Bid
$8,500,000 est. value
Klamath Falls, OR

Spring Street Sewer Treatment Plant - 3B GMP
Renovation, Infrastructure
Post-Bid
$6,000,000 CJ est. value
Klamath Falls, OR 97601

OR58: Salt Creek Tunnel to MP 70 Section of the Willamette Highway (Rt. No. OR58) Near Odell Lake
Infrastructure
Results
$5,000,000 to $10,000,000 est. value

2022 Paving Improvements at Collier Memorial State Park
Infrastructure
Results
$500,000 est. value
Chiloquin, OR 97624

Klamath County Fairgrounds 48 Space RV Park
Infrastructure, Build-out
Construction
$2,669,158 CJ est. value
Klamath Falls, OR 97603

Klamath County Fairgrounds 48 Space RV Park
Infrastructure, Build-out
Construction
$2,669,158 CJ est. value
Klamath Falls, OR 97603

Oregon Department of Human Services Building at TimberMill Shores
New Construction, Infrastructure - 92,000 SF
Pending Verification
$30,000,000 CJ est. value
Klamath Falls, OR 97601

OC&E State Trail
Infrastructure, Renovation
Design
$1,052,343 CJ est. value
Beatty, OR 97621

RFP Construction Manager - F-15 Static Display and Plaza
Infrastructure
Post-Bid
$500,000 CJ est. value
Klamath Falls, OR 97601

US97 Barkley Springs Bridge Paving
Infrastructure
Results
$3,000,000 est. value
Chemult, OR 97731

US 97 N. Klamath Falls Interchange to S. 6th Street
Infrastructure
Design
$10,197,390 CJ est. value
Chiloquin, OR 97624

Last Updated 07/26/2023 02:54 PM
Project Title

Us 97 Hwy 4 Over Uprr Structure Approach Paving

Physical Address View project details and contacts
City, State (County) Klamath Falls, OR 97601   (Klamath County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $111,515 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

ODOT contact person: Joni Sirovatka, Procurement Specialist Contact phone: 541-207-7265 Contact email: Joni.a.sirovatka@odot.oregon.gov Please note: The resulting contract is for a public works project subject to prevailing wage rates, in accordance with ORS 279C.800 to 279C.870. Grind 2 of asphalt from both the North and South approaches of the US 97 HWY 4 UPRR structure and then pave back to match bridge deck elevation providing a smooth ride and transition. The approach area to be completed will start directly following the concrete bridge deck and measure 150 long x 44 wide. Contractor needs to use caution to avoid contact with the concrete impact panels while the cold plane pavement removal takes place, also present is an Asphalti Plug joint located on the North end of the structure, which includes a steel plate that is @ 2 in depth, its the contractors responsibility to avoid contact with drum grinder while the cold plane pavement removal is taking place. The work will include performing all traffic control and installing temporary pavement markers once work is completed. ODOT crews will be responsible for the permanent striping and any joint work thats needs to be completed

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents