Similar Projects
Last Updated | 08/10/2020 11:31 AM |
Project Title | Wylie Rockwall-Farmersville 36"/48" Pipeline, Phase 2 Improvements |
Physical Address | View project details and contacts |
City, State (County) | Wylie, TX 75098 (Collin County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Lines |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $10,295,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project includes construction of approximately 20,100 LF of 48-inch water line; 650 LF of tunnel with 66-inch I.D. tunnel liner plate; connections to existing water transmission lines; and all other improvements detailed in the construction plans and specifications. The 48-inch water line generally parallels an existing Oncor transmission line beginning at the intersection of Kreymer Lane and Brown Street and terminating at County Road 484. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |