Similar Projects
US Cellular Center Mechanical/HVAC Renovation
Post-Bid
Asheville, NC

HVAC Replacements
Post-Bid
Salisbury, NC

56--Upgrade OA & Exhaust Fans Phase II(VA-19-00005148)
Demolition
Results
$500,000 to $1,000,000 est. value
Durham, NC 27705

Frank Porter Graham Elementary School - Intermediate & Media Buildings Hvac Replacement
Results
Chapel Hill, NC

McEniry HVAC and IT Infrastructure Upgrades
Construction
$10,000,000 est. value
Charlotte, NC 28223

JC Morgan HVAC Replacement
Post-Bid
High Point, NC 27260

Brinkley Building Cosmetology HVAC Upgrades
Results
Thomasville, NC

20 Ton Air-Cooled Chiller
Post-Bid
Greensboro, NC 27412

Cordelia Camp Backfill - Admissions to HFR 1st Floor Upfit - HVAC System
Results
Cullowhee, NC 28723

PC Air Units
Post-Bid
Charlotte, NC 28208

Chancellor's Residence HVAC Renovation
Results
Chapel Hill, NC 27514

Chiller Service and Inspection
Term Contract
Post-Bid
Pembroke, NC

Install 10 HVAC Systems in RHA Occupied Public Housing Community
Results
Rockingham, NC 28379

DSS Building - Chiller Replacement Phase 2
Post-Bid
Fayetteville, NC 28301

Hope Mills and South View Middle School Gymnasium HVAC Renovation Project
Results
Hope Mills, NC 28348

Last Updated 02/09/2021 02:19 PM
Project Title

Woodard Hall Building and Massey Activity Center HVAC Replacement

Physical Address View project details and contacts
City, State (County) Wilson, NC 27893   (Wilson County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The current HVAC for both the first and the second floor does not have enough air flow within the building and the new system will assist with keeping it cool and keeping the building warm whenever needed. The chiller replacement in Massey Activity Center is needed because it currently does not have sufficient flow in the building for heating and cooling. The purpose of this work will also replace these units providing cooling for classroom space and IT equipment.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents