Similar Projects
Lockwood Folly Park Facilities - Brunswick County
Infrastructure
Conception
$3,800,000 CJ est. value
Bolivia, NC 28422

Northwest District Park - Brunswick County
Infrastructure
Conception
$5,690,000 CJ est. value
Leland, NC 28451

Walmart Supercenter #2772-242 - Smart Bundle
Renovation - 154,015 SF
Design
Southport, NC 28461

Walmart Supercenter #4274-276 - Smart Bundle
Renovation - 203,820 SF
Design

Boiling Spring Lakes Dams Construction/Re-Construction Project
Infrastructure
Bidding
$28,046,648 CJ est. value
Boiling Spring Lakes, NC 28461

Offices and Shoppes at Waterford - Building A
New Construction, Infrastructure - 39,005 SF
Bidding
$10,000,000 CJ est. value
Leland, NC 28451

Ash - Waccamaw Multiuse Building - Brunswick County
New Construction, Infrastructure
Post-Bid
$5,000,000 CJ est. value
Ash, NC 28420

Lowe's Home Improvement
New Construction - 113,786 SF
Post-Bid
Leland, NC 28451

Community Center Site Improvements
Infrastructure
Results
$720,500 to $950,279 est. value
Saint James, NC

MOTSU Firefighting Water System
New Construction, Infrastructure
Results
$14,971,812 CJ est. value
Southport, NC 28461

Arbor Landing at Compass Pointe
New Construction, Infrastructure
Pending Verification
$4,417,660 CJ est. value
Leland, NC 28451

Novant Health Leland ASC
New Construction, Infrastructure
Pending Verification
$16,591,690 CJ est. value
Leland, NC 28451

Project Indigo
New Construction, Infrastructure - 80,000 SF
Conception
$565,000,000 CJ est. value
Southport, NC 28461

Walmart Supercenter #1767-244 - Smart Bundle
Renovation
Design
Shallotte, NC 28470

Town Center Park Phase 2
Infrastructure
Bidding
$60,000 CJ est. value
Ocean Isle Beach, NC 28469

Last Updated 02/07/2023 10:12 AM
Project Title

National Chain Retail Store - Southport Crossings / Southport

Physical Address View project details and contacts
City, State (County) Southport, NC 28461   (Brunswick County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Retail, Site Development
Contracting Method Bids by Invitation
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 7, 2023, this project has been awarded. Construction is expected to start March 2023 and no firm timeline as to when construction is anticipated to be finished. *This project has been awarded and all trades have been let.

Details

1 Story Above Grade, 25,674 SF.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Door Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Loading Dock Equipment.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents