Similar Projects
Telecommunication System Upgrade
Alteration
Bidding
$1,500,000 to $2,000,000 est. value
Redwood City, CA

Conduit Infrastructure For Wi-Fi Expansion
Infrastructure
Bidding
Los Angeles, CA 90081

Provide, Install, and Maintain A 10Gb Ethernet Lsd Access Circuit On The Iqo Contract Between Bldg 500, Room 111, 1776 National Guardway, Reno, Nv 89502 /Cci And Bldg 2145, Room 105, 5801 C Street, Be
Term Contract
Post-Bid
Reno, NV 89502

Provide, Install and Maintain LSD 10 Gb Ethernet IP BKBN CRT for Building 500 Room 111 and DISA IE1 CISCO ASR-9010 RTR
Term Contract
Post-Bid
San Diego, CA - Reno, NV 89502

Install Vehicle Detection Systems
Alteration
Results
$1,050,000 est. value

Install Vehicle Detection Systems
Alteration
Results
$1,050,000 est. value

Fixed Camera Infrastructure Project
Alteration
Bidding
Port Hueneme, CA

Submit A Quote To Provide, Install, And Maintain A 10Gb Circuit
Term Contract
Post-Bid
Lemoore, CA 93245

District Wide Alarm System Installation and Monitoring Services Project
Alteration
Results
Menifee, CA 92584

RCD Security Screen Installation
Alteration
Bidding
$500,000 est. value
Oakland, CA 94612

Provide, Install, And Maintain A 10Gb Circuit
Term Contract
Post-Bid
Lemoore, San Diego, CA 93245

Upgrade of Smart Classroom Audio Visual (AV) Equipment in 28 Classrooms And 3 Conference Rooms
Alteration
Results
Pasadena, CA 91106

Fire Station Alerting System Replacement
Term Contract, Alteration
Bidding
Roseville, CA 95678

Provide, Install, and Maintain a 25Mb Etht End-To-End LSE on IGO Bull.
Term Contract
Post-Bid
Lemoore, CA 93245

James Ranch Juvenile Probation Video Surveillance
Term Contract, Alteration
Results
Morgan Hill, CA 95037

Last Updated 09/23/2021 09:28 AM
Project Title

Video Surveillance System (VSS)

Physical Address View project details and contacts
City, State (County) San Francisco, CA   (San Francisco County)
Category(s) Single Trades
Sub-Category(s) Security/Communications
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Upgrade of Video Surveillance System. The Contractor shall be responsible for the removal, inventory, packaging for storage and return of all removed CCV equipment to the FPS COR. All currently installed wire, cable, and fiber, shall be completely removed by the Contractor and properly disposed of.

Details

Division 11 - Equipment, Audio-Visual Equipment.
Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents