Similar Projects
Last Updated | 06/15/2022 04:25 PM |
Project Title | Underground Utility District 38 |
Physical Address | View project details and contacts |
City, State (County) | Alameda, CA (Alameda County) |
Category(s) | Heavy and Highway, Professional Services |
Sub-Category(s) | Engineering, Paving/Reconstruction, Sidewalks/Parking Lot |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | All overhead utilities within Underground Utility District (UUD) 38 are to be relocated from overhead to underground. This project includes the material, labor, and equipment required to provide trenching, sidewalk and street saw cutting, sidewalk and street removal and replacement, and the removal and installation of underground substructures for Alameda Municipal Power (AMP) facilities (electric & fiber), City of Alameda (streetlights & fiber), AT&T California (AT&T), and Comcast Corporation (Comcast). AMP is the lead utility responsible for managing this joint trench project. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |