Similar Projects
RFQ Contractor - Replace HVAC Building 105,Haskell Indian Nations University
Alteration
Design
$1,000,000 est. value
Lawrence, KS 66046

HVAC Air Filters
Term Contract
Sub-Bidding
Overland Park, KS 66204

HVAC and Mechanical Products
Term Contract
Post-Bid

HVAC and Mechanical Products
Term Contract
Post-Bid

Roberts Building HVAC Replacement
Results
$439,994 est. value
Olathe, KS 66061

Replacement of HVAC Equipment at the East Lawrence Recreations Center, Kaw River Waste Water Treatment Plant and Fire Medical Station 2
Alteration
Results
Lawrence, KS

Headworks Make-Up Air Unit Replacement HVAC Improvements
Post-Bid
McPherson, KS

Ottawa HS Chiller Replacement
Alteration
Results
Ottawa, KS 66067

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Replacement of Vav Boxes in Administration Building Phase II
Alteration
Results
Less than $128,000 est. value
KS

Traulsen Blast Chillers
Term Contract
Post-Bid
Leavenworth, KS

FOSC - Move Heat Pump Unit
Term Contract
Results
$25,000 to $100,000 est. value
Fort Scott, KS 66701

Replacement of Gas Fired Radiant Heaters at the Lawrence Airport
Alteration
Post-Bid
Lawrence, KS 66044

Gas Turbine Cooling System Project
Alteration
Results
Gardner, KS

South Plant HVAC Upgrades
Alteration
Post-Bid
Lansing, KS

Last Updated 09/09/2022 03:03 PM
Project Title

Arnold Arena - HVAC System

Physical Address View project details and contacts
City, State (County) Fort Scott, KS 66701   (Bourbon County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $50,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Fort Scott Community College (FSCC) is in the process of installing a HVAC system in Arnold Arena gymnasium. Scope of work: Provide and install one approximately 25 ton ground mounted package unit on southwest face of arena building to serve arena space. Provide a fabric duct equal to DuctSox Sedona XM with internal hoop supports along each side of gymnasium, ducts shall be approximately 26"O each. Fabric supply ducts shall be routed tight to bottom of metal building rigid frames. Route rectangular supply and return ducts from packaged unit up to above second floor storage area above locker rooms to southwest wall of gymnasium area. Return air grill to be mounted just above second floor storage area floor level. Provide power for package unit from nearest electrical panel large enough to serve additional electrical load, circuit may need to be brought from main electrical room on north end of building. Contractor to verify existing electrical service is capable of serving additional HVAC electrical load. All sizes indicated above are approximate and should be verified by design build contractor prior to bidding and final design shall be stamped by a licensed professional engineer in the state of Kansas. General Method of Procedure A. Working space and space available for storing materials shall be verified with the Owner prior to construction. B. Workmen are subject to rules of the Owner applicable to their conduct. C. Building will be occupied during performance of work, but areas of alterations will be vacated as required. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in Owner operations will not be hindered. Contractor shall permit access to Owner personnel through construction areas. Contractor to provide temporary means of protected access to all occupied areas of alteration during the construction period. D. Utilities Services: Maintain existing utility services for building at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing systems, they shall be cut and capped at suitable places where approved by owner. Contractor shall submit a request to interrupt any such services to Owner 48 hours in advance of proposed interruption. E. Protection: Provide following protective measures: a. Temporary protection against damage for all portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated. b. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed. Applicable State Laws A. Contractor and all subcontractors of all trades present on site shall comply with state and local laws and ordinances while present on public property. B. Absolutely no tobacco or e-cigarette use is permitted in building or on the project site. Restoration A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise directed, do not cut, alter or remove any structural work. Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to Owner before it is disturbed. Materials and workmanship used in restoring work shall conform in type and quality to that of original existing construction, except as otherwise directed by owner. B. Upon completion of contract, deliver work complete and undamaged. Damage caused by Contractor or Contractor's workmen to existing structures, grounds, and utilities or work done by others shall be repaired by Contractor and left in as good condition as existed prior to damaging. A. Consequential damage to Owner's existing equipment or building contents in the existing building or on site as a result of work being performed will be replaced at Contractor's expense. Winning bid will be notified after approval by the Board of Trustees. Fort Scott Community College reserves the right to reject all bids. If there are any questions, please email them to Jared Keylon, jaredk@fortscott.edu. Address Fort Scott Community College ATTN: Julie Eichenberger - Arnold Arena - HVAC System 2108 South Horton Street, Fort Scott, KS 66701 Digital Subject: Arnold Arena - HVAC System Bid rfp@mailboxes.fortscott.edu

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents