Similar Projects
Local Road Maintenance
Bidding
La Valle, WI

Statewide Pavement Maintenance 2021-2022
Term Contract
Bidding
Less than $5,000 est. value

2020 Freedom Road Paving
Post-Bid
North Freedom, WI 53951

Airfield Paving Construction MATOC
Post-Bid
Less than $400,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

Road and General Construction Multiple Award IDIQ for the Chequamegon-Nicolet NF
Results
$5,000 to $7,000,000 est. value

2021 Seal Coating
Bidding
WI

Columbia County Road Improvements
Renovation
Post-Bid
Columbus, WI

I-39 - Columbus, North Street to School Street
Results
Columbus, WI 53925

CTHW - Local Road Improvement
Bidding
Baraboo, WI

Wendt Road in Town of Columbus and Berkvam Road in Town of Otsego
Renovation
Post-Bid
Columbus, WI

Sauk City - IH 39, Eagle View Court to Weynand Road
Results
Sauk City, WI 53583

2021 Road Improvements
Bidding
WI

2021 Chip Seal
Post-Bid
$82,938 est. value
Portage, WI

C. Portage, Wisconsin and Dewitt Sts, Ontario Street to E. Pleasant Street
Results
Portage, WI 53901

Last Updated 03/15/2021 02:36 AM
Project Title

Reedsburg - Wisconsin Dells, N. Jct. STH 33 Intersection, Reedsburg -Wisconsin Dells, Copper Springs Road to N. Jct. STH 33, Reedsburg - Baraboo,N. Jct. STH 23 to USH 12

Physical Address View project details and contacts
City, State (County) Baraboo, Reedsburg, Wisconsin Dells, WI (Columbia, Sauk Counties)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Excavation Common, 6,058 CY; Base Aggregate Dense, 7,077 Ton; Marking Epoxy, 19,687 LF; Construction Staking, 56,120 LF; Construction Staking, 4 Each; Construction Staking, 2 LS; Conduit, 1,655 LF; Culvert Pipe, 36 LF 24”; Concrete Curb and Gutter, 312 LF; HMA Pavement, 42,691 Ton; Removing Asphaltic Surface Milling, 214,925 SY; Tack Coat, 26,105 Gals; Signs, 43 SF.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 10 - Specialties, Signage.
Division 26 - Electrical, Lighting.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents