Similar Projects
Building B Air Tempering - Phase 1 - GPC
Bidding
Less than $2,200,000 est. value
Oshkosh, WI

UW Platteville HVAC System Renovation And Skylight Replacement
Renovation
Bidding
Platteville, WI 53818

Vendor Service Contract for Essential/Emergency HVAC Services
Term Contract
Post-Bid
Milwaukee, WI 53202

Ionization System Installation
Post-Bid
Lancaster, WI 53813

911 Center Data Room Backup Cooling
Results
Madison, WI 53703

HVAC Upgrade
Results
Less than $225,000 est. value
Madison, WI 53593

HVAC Replacement
Bidding
WI

HVAC, Hot Water Heaters & Refrigerators
Term Contract
Post-Bid

Heating and Cooling Units Replacement
Results
Less than $210,000 est. value
Janesville, WI 53546

Wi Resource Center Building `B` Air Tempering
Renovation
Bidding
Oshkosh, WI

Emergency Furnace Replacements
Term Contract
Post-Bid
Wisconsin Dells, WI 53965

Replacement of Furnaces
Results
$25,000 to $100,000 est. value
Fountain City, WI 54629

Insulation Replacement for SMF Building, HVAC Ductwork
Bidding
Manitowoc, WI

HVAC Hot Water Heaters and Refrigerators Installment
Term Contract
Post-Bid

Kitchen Hood Replacement - MEP
Results
Less than $674,000 est. value
Menomonie, WI 54751

Last Updated 02/25/2021 04:22 PM
Project Title

J065--Fume Hood Testing New

Physical Address View project details and contacts
City, State (County) Tomah, WI   (Monroe County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This shall include a comprehensive and detailed report at the conclusion of the inspections and testing noting any deficiencies and the corrective actions needed. The inspection and report shall include the following items: A. Test and certify one (1) LAFW in the IV room. (Rm #1647A) and one (1) LAFW in modular IV prep room tested as a Segregated Compounding Area (SCA). B. Test and certify two (2) supply High-Efficiency Particulate Air (HEPA) filters, located in (Rm #1647A and 1647) and two (2) HEPA filters located in SCA. C. Calculate and report supply air changes per hour in two (2) clean zones. 1) Rm. #1647A D. Rm. #1647 and SCA: Calculate and report pressure gradients at three (3) room locations. E. Classify three clean room zones. Perform non-viable environmental sampling (particle count sampling) in 3 clean room zones. F. Perform viable environmental sampling in two (2) LAFW and three (3) clean room zones. Four samples per room or Primary Engineering Control (PEC), two samples from 1647 pass through, twenty-two (22) total microbial samples. G. Provide control samples for viable environmental sampling (control plates). H. Perform non-viable environmental sampling (particle count classification) in two (2) LAFW. I. Perform dynamic smoke visualization tests in LAFW. Must work with site to have visual smoke testing video-recorded for site. J. Perform all tests, certifications and classifications according to USP-NF General Chapter 797 Pharmaceutical Compounding – Sterile Preparations and most current version of Controlled Environment Testing Association-CETA-Application Guide-003 (CETA-CAG-003). K. Work must be completed prior to 2PM.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Fume Hoods, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents