Similar Projects
Glendale Middle School Science Lab
Post-Bid
Salt Lake City, UT 84104

Bryant Middle School Science Lab Remodel
Renovation
Post-Bid
Salt Lake City, UT 84102

Building 72 Eae Master Plan and Phase 1 Buildout
Results
Less than $328,231 est. value
Salt Lake City, UT

Cottonwood High Theater Remodel
Renovation
Results
Less than $100,000 est. value
Murray, UT 84121

American Academy of Innovation Charter School
Addition - 3,285 SF
Construction
South Jordan, UT 84095

Granite Education Center Lobby and Cafe Remodel
Construction
$300,000 to $350,000 est. value
Salt Lake City, UT 84115

Beehive Academy
New Construction - 77,584 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Draper, UT 84020

Skyline High School Replacement Athletics
Post-Bid
Salt Lake City, UT 84109

Portable Classroom General Repairs
Term Contract
Results
Less than $40,000 est. value
Salt Lake City, UT

Oquirrh Hills Middle Remodel - Part II
Renovation
Construction
Riverton, UT 84065

Union Middle School Replacement
Term Contract
Post-Bid
$55,000,000 est. value
Sandy, UT 84070

General Contractors Pre-Qualification
Results
Sandy, UT 84070

Earthquake Group 3, Bid #2
Construction
Salt Lake City, UT 84104

Construction: GEC Cafe Dish Room Remodel
Renovation
Post-Bid
Salt Lake City, UT 84115

Riverton High School Cafeteria Remodel Part II
Renovation
Results
Riverton, UT 84065

Last Updated 10/01/2020 01:51 PM
Project Title

Granite Park Junior High School Remodel

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84115   (Salt Lake County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method
Project Status Construction Commenced March 2020, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

General contractor to perform a remodel to accommodate the addition of the 6th grade to Granite Park Jr. This includes items such as: 1. New storefront, security doors, card access, and security access wire pulled to each of the existing exterior doors. 2. Interior remodel of the front office area, little theater and a couple of classrooms. 3. New lighting, carpeting, and millwork. 4. Rework and add new concrete ramps to meet ADA needs.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents