Similar Projects
Dalrymple Road Sidewalk TS168
Infrastructure
Bidding
Sandy Springs, GA

I-285 WB Ashford Dunwoody Road Ramp Extension
Post-Bid
GA

Dunwoody Parking Lot Repairs
Post-Bid
$380,000 est. value
Dunwoody, GA 30338

East Mountain Street Sidewalk
Results
Stone Mountain, GA 30086

Pedestrian Enhancements - Trailhead and Rowland Street
Results
Clarkston, GA

Public Work Services
Post-Bid
Brookhaven, GA

Elmdale Drive Sidewalk Project
Results
Tucker, GA 30084

Roadway, Sidewalk, Right of Way Maintenance and Repair Services
Infrastructure
Post-Bid
Sandy Springs, GA

0.180 Mile of Widening and Reconstruction for Ramp Improvements on US 78/SR 10 at SR 236
Results
GA

Ashford Dunwoody Road Multiuse Path
New Construction
Results
Brookhaven, GA

Pedestrian Safety And Bicycle Trail Improvements
Results
Decatur, GA

Concrete Pads for Marta Shelters
Results
Stonecrest, GA

Murphey Candler Park - North Boardwalk
Results
$860,000 est. value
Atlanta, GA 30319

Peeler Road Shared Use Path
Results
Dunwoody, GA

Vermack Road Shared Use Path From Womack to Vanderlyn
Results
Dunwoody, GA

Last Updated 04/06/2022 10:08 AM
Project Title

Cooledge Road Sidewalk Project

Physical Address View project details and contacts
City, State (County) Tucker, GA 30084   (DeKalb County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The Cooledge Road Sidewalk Project will consist of two segments. The first segment of the project is to begin at the exit driveway of 1531 Cooledge Road on the eastern side of the road and will continue northbound until connecting to the existing sidewalk on the backside of 1695 Carrington Pointe. The second segment will begin at the corner of entrance to Edinburgh Way on the west side of the road and continue northbound until connecting to the existing sidewalk in front of 1812 Cooledge Road. The project includes the construction of a new 5-foot-wide sidewalk segment, curb and gutter, stormwater drainage, signage, and landscaping improvements.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents