Similar Projects
Last Updated | 06/30/2021 11:47 AM |
Project Title | Crescent Hill Filter Plant - Chemical Building - Phase 2 |
Physical Address | View project details and contacts |
City, State (County) | Louisville, KY 40206 (Jefferson County) |
Category(s) | Sewer and Water |
Sub-Category(s) | Water Treatment Plant |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $8,930,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Phase 2 renovation of the Crescent Hill Filter Plant Chemical & Lab Buildings located at 3018 Frankfort Avenue. Phase 2 project renovations shall consist, but not be limited to, demolition of existing structures, in conflict with the improvements, updating all existing building areas and reclaiming all unused existing floor space for repurposing, adding new floor space with the construction of new concrete floors, and structural steel supports for the 2nd through 7th floors in the Chemical Building which also includes completing construction of two fire rated stairwells to the new 7th floor, install a fire pump and fire protection sprinklers throughout the Lab, and Chemical Buildings, upgrade the one existing elevator with all new cab, lift mechanicals and all new controls, renovation of the existing locker rooms and restrooms and abatement of lead paint within limits of the project, including all labor, rigging, equipment and materials. |
||||||||||||||||||
Details | Water Treatment Plant, Renovation.
|
||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |