Similar Projects
Rhyne Terraces
New Construction, Infrastructure
Conception
$30,000,000 CJ est. value
Gastonia, NC 28052

Sewer Expansion - Southern I-85 Area - Davidson County
Infrastructure
Conception
$38,423,583 CJ est. value
Bessemer City, NC 28016

Kendrick Townhomes
New Construction, Infrastructure
Design
$32,000,000 CJ est. value
Gastonia, NC 28052

Ovata at Blackwood Creek
New Construction, Infrastructure
Design
$29,000,000 CJ est. value
Gastonia, NC 28052

Oak Commerce Center - Building I
New Construction, Infrastructure - 471,860 SF
Bidding
$30,600,000 CJ est. value
Belmont, NC 28056

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Hemphill Road Tce Site, Site Id(B4q1) Task Order
Term Contract
Post-Bid
Gastonia, NC 28056

Aerial Sewer/Water Repairs - Bridgewood Lane, Bradley Center Outfall, and Modena Street Outfall
Infrastructure
Results
Gastonia, NC 28054

Water System Extension to Serve Paul Beam Road Area Near Cherryville
Infrastructure
Results
$997,018 CJ est. value
Cherryville, NC 28021

Premix Inc. Manufacturing Plant
New Construction, Infrastructure - 66,000 SF
Construction
$50,000,000 CJ est. value
Dallas, NC 28034

Belmont Abbey College
New Construction, Infrastructure
Construction
$15,000,000 CJ est. value
Belmont, NC 28012

Howe's Landing
New Construction, Infrastructure
Pending Verification
$340,000,000 CJ est. value
Gastonia, NC 28056

RFQ Engineering - Long Creek Outfall Preliminary Engineering Report (PER)
Renovation, Infrastructure
Pending Verification
$250,000 CJ est. value
Gastonia, NC 28054

FUSE - Silent Crossing at Trenton Street - City of Gastonia
Infrastructure
Conception
$488,878 CJ est. value
Gastonia, NC 28052

New Hope Road Retail
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Gastonia, NC 28052

Last Updated 07/24/2023 04:25 PM
Project Title

Vantine Pump Station and Sewer Replacement

Physical Address View project details and contacts
City, State (County) Bessemer City, NC 28016   (Gaston County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $1,800,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

THE PROJECT GENERALLY CONSISTS OF the replacement of approximately 2,400 linear feet of gravity sewers with 8-inch SDR 35 PVC gravity sewers, installation of 2,000 linear feet of 6-inch DI force main, installation of 18 manholes, abandonment of existing manholes, and reconnection of 36 sewer services. The project will also generally include the rehabilitation of Vantine Pump Station including two (2) 200 gpm pumps, valves, controls, electrical upgrade, and related appurtenances

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents