Similar Projects
Cooling Tower Repair
Alteration
Design
$16,066 est. value
Ridgeland, SC 29936

Jasper County MHC HVAC Replacement
Renovation
Sub-Bidding
$45,000 CJ est. value
Ridgeland, SC 29936

Pool Dehumidifier/HVAC Maintenance
Term Contract
Sub-Bidding
Myrtle Beach, SC 29577

Heating, Ventilation, and Air Conditioning (HVAC) Project for East North Street Academy
Post-Bid
Greenville, SC 29607

Statement of Qualifications For HVAC And Electrical Contractors
Post-Bid
Conway, SC

Repair HVAC Dormitory Building 2405 and 2406
Results
$1,000,000 to $5,000,000 est. value
Charleston, SC 29404

Repair HVAC Dormitory Building 2405 and 2406
Results
$1,000,000 to $5,000,000 est. value
Charleston, SC 29404

Pee Dee Mental Health Center (MHC) Chiller and Boiler Replacement
Renovation
Construction
$312,859 CJ est. value
Florence, SC 29506

C. Lem Harper Building - DDC Controls Upgrade
Renovation
Sub-Bidding
$500,000 CJ est. value
Columbia, SC 29201

MRD Water Treatment Maintenance
Post-Bid
Charleston, SC 29412

HVAC Maintenance
Results
Darlington, SC 29532

SCGSAH HVAC Chiller/Boiler Replacement
Renovation
Sub-Bidding
$400,000 CJ est. value
Greenville, SC 29601

Covid-19 HVAC Equipment Servicing
Post-Bid
Fort Mill, SC

Bryan/Morris Village Cooling Tower Piping Replacement
Results
$1,300,000 to $1,500,000 est. value
Columbia, SC 29203

Beech Hill Elementary School Partial Roof Replacement
Renovation
Sub-Bidding
$700,000 CJ est. value
Summerville, SC 29483

Last Updated 09/06/2022 07:02 PM
Project Title

Hampton County Mhc Hvac Replacement

Physical Address View project details and contacts
City, State (County) Varnville, SC 29944   (Hampton County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $45,000 [brand] Estimate
Plans Available from Mechanical Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

*The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. DESCRIPTION OF PROJECT: Replacement of 2 split system heat pumps with new units as detailed on the drawings and specifications OFFEROR agrees that this Quote, including all alternates, if any, may not be revoked or withdrawn after the opening of quotes, and shall remain open for acceptance for a period of 60 Days following the Quote Date, or for such longer period of time that OFFEROR may agree to in writing upon request of the Agency. The effective date of this agreement shall be the date at the top of this page. The Date of Commencement of the Work shall be , 20 . The Contract Time is established as 90 calendar days and shall be measured from the Date of Commencement. The Contractor agrees that the Agency shall be entitled to withhold or recover from the Contractor Liquidated Damages in the amount of 250.00 for each Calendar Day the Contractor fails to achieve Substantial Completion of the Work within the Contract Time specified or adjusted as provided in the Contract Documents

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents