Similar Projects
Last Updated | 03/18/2022 03:25 AM |
Project Title | Thin Bonded Multi-Layer Overlay |
Physical Address | View project details and contacts |
City, State (County) | (Carson City, Washoe Counties) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $620,000 to $745,000 |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Thin bonded multi-layer overlay for three structures on or over I-580. Structure H-2286 is on Clearview Drive over I-580 in Carson City, structure H-2287 is on Koontz Lane over I-580 in Carson City, and structure I-2936 is on I-580 over Meadowood Mall Way in Washoe County. Clearview Drive (H-2286) in the project area is an Urban Minor Arterial with one 12-foot lane per direction, a 12-foot leftturn lane on the East side of the structure, and 4-foot shoulders with pedestrian sidewalks in both directions. The directional traffic is separated by yellow lane markings. The posted speed limit is 35 mph throughout the project area. No heavy truck information is available for the roadway. Traffic control will consist of single lane closures which will be done utilizing flaggers and a pilot car. Koontz Lane (H-2287) in the project area is an Urban Minor Collector with one 12-foot lane per direction, a 12-foot leftturn lane across most of the structure, and 4-foot shoulders with pedestrian sidewalks in both directions. The posted speed limit is 35 mph throughout the project area. Heavy trucks are not permitted on Koontz Lane. Traffic control will consist of single lane closures which will be done utilizing flaggers and a pilot car. I-580 in the project area (I-2936) is an Urban Interstate with three 12-foot lanes per direction, 12-foot exterior and 10- foot interior shoulders. The posted speed limit is 65 mph throughout the project area. The heavy truck percentage is 1.6 % for the roadway. Traffic control will consist of night work with speed reduction through project area. Seq# Item Number Unit Of Measure Quantity Description 1 4970100 Sqyd 4,562.000 Bridge Deck Preparation 2 4970110 Sqyd 4,562.000 Thin Bonded Multilayer Overlay 3 5020360 Fa 1.000 Concrete Bridge Deck Repair 4 6240130 Fa 1.000 Uniformed Traffic Control Officer 5 6240140 Day 30.000 Traffic Control Supervisor 6 6250490 Ls 1.000 Rent Traffic Control Devices 7 6280120 Ls 1.000 Mobilization 8 6320100 Mile 0.240 Contrast Striping 9 6320880 Linft 626.000 Epoxy Pavement Striping (8-Inch Broken White) 10 6320915 Linft 980.000 Epoxy Pavement Striping (6-Inch Solid White) 11 6320930 Linft 436.000 Epoxy Pavement Striping (8-Inch Solid White) 12 6321020 Linft 324.000 Epoxy Pavement Striping (8-Inch Solid Yellow) 13 6321070 Linft 650.000 Epoxy Pavement Striping (Double Solid Yellow) 14 6341060 Sqft 62.000 Thermoplastic Pavement Marking (Varies) 15 6370110 Ls 1.000 Temporary Pollution Control |
||||||
Details |
|
||||||
Bidder's List | View project details and contacts | ||||||
Prospective Bidders | View project details and contacts | ||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |