Similar Projects
Phase 1 HVAC Replacement Ramsey Street High School
Bidding
Fayetteville, NC 28301

DSS Building - Chiller Replacement Phase 2
Post-Bid
Fayetteville, NC 28301

College Lakes Elementary Kitchen A/C
Post-Bid
Fayetteville, NC 28311

HVAC Maintenance Contract
Term Contract
Results
Less than $713,590 est. value
Dunn, Erwin, Lillington, Spring Lake, NC 27546

Westover High School HVAC Infrastructure Phase II
Results
Fayetteville, NC 28303

Hope Mills Middle Auditorium Compressor Replacement
Post-Bid
Hope Mills, NC 28348

Job Order Contract for HVAC Installation and Repair
Term Contract
Results
Fayetteville, NC 28302

Crown Coliseum Cooling Tower Replacement
Post-Bid
Fayetteville, NC 28302

Hope Mills Middle Locker Room HVAC Addition
Results
Less than $17,333 est. value
Hope Mills, NC 28348

Spring Lake Chiller Replacement
Post-Bid
Fayetteville, NC 28302

Pine Forest Middle School Building 3 HVAC Renovation
Results
Fayetteville, NC 28311

Removal of Thirty-Two (32) R-22 10 Seer Air Handlers in 32 Occupied Apartment Units
Post-Bid
Fayetteville, NC 28301

South View Middle School Classroom Area HVAC Upgrade
Results
Hope Mills, NC 28348

SPLFRC Packaged Unit Replacement
Post-Bid
Spring Lake, NC 28390

Furnish and Deliver Trenton Products Walk-In Cooler and Freezer Systems
Results
Less than $14,397 est. value
Bonnie Doone, NC 28303

Last Updated 04/12/2021 04:34 PM
Project Title

Health Technology Center – Mechanical Renovation

Physical Address View project details and contacts
City, State (County) Fayetteville, NC   (Cumberland County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The construction will consist of three base bid phases. Phase 1 will consist of installation of piping isolation valves in order to isolate mechanical rooms from the main heating and cooling systems. Selective pre-TAB readings for documentation of existing conditions. Phase 2 will consist of demolition of five (5) existing 4-pipe constant volume modular air handling units (AHUs) and replacement with new. Phase 3 will consist of demolition of six (6) existing 4-pipe constant volume modular air handling units (AHUs) and replacement with new. Variable speed drives and new HVAC controls will be provided for each new AHU. The existing electrical circuits serving each AHU will be reused and modified as required. Phase 4 (Alternate No. 3) consists of one-for-one replacement of the existing 125-ton water-cooled chiller. Alternate No. 4 consists of selective ceiling tile or ceiling grid & tile replacement throughout the building. Alternate No. 5 consists of addition of variable speed drives to the existing HVAC heating hot water and chiller water pumps.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents