Similar Projects
Prisons Facilities Infrastructure Improvements - City of Philadelphia
Renovation
Conception
$14,500,000 CJ est. value
Philadelphia, PA 19102

RCF and CFCF Locks Replacement - City of Philadelphia
Renovation
Conception
$13,000,000 CJ est. value
Philadelphia, PA 19136

SCI Greene - Soil Remediation and Structural Repairs - Phase 2
Renovation, Infrastructure
Bidding
$2,310,000 CJ est. value
Waynesburg, PA 15370

Allegheny County Jail Recreation And Showers II
Renovation
Bidding
$400,000 CJ est. value
Pittsburgh, PA 15219

State Correctional Institute (SCI) Waymart - Exterior Building Envelop and Site Infrastructure Upgrades
Renovation, Infrastructure
Post-Bid
$4,000,000 CJ est. value
Honesdale, PA 18431

State Correctional Institute (SCI) Waymart - Exterior Building Envelop and Site Infrastructure Upgrades
Renovation, Infrastructure
Post-Bid
$4,000,000 CJ est. value
Honesdale, PA 18431

"D" Tier Renovation - Northampton County Prison
Renovation
Results
Easton, PA 18042

Renovate Unit 1B
Renovation
Results
$1,000,000 to $5,000,000 est. value
Allenwood, PA

New Fayette County Prison - General Construction
New Construction
Construction
Uniontown, PA 15401

SCI Forest - Upgrade/Replace PLC and Microlite System and BAS Upgrade
Renovation
Bidding
$5,800,000 CJ est. value
Marienville, PA 16239

Department of Corrections and Youth Center Facility Maintenance Services
Term Contract
Post-Bid
Doylestown, PA 18901

Jail HVAC Upgrades - General Construction
Renovation
Results
Danville, PA 17821

SCI Coal Township - Structural Re-Support for Exterior Piping and Mechanical Renovations
Renovation
Bidding
$5,000,000 CJ est. value
Coal Township, PA 17866

Westmoreland County Prison Storage Building
Renovation, Infrastructure - 1 SF
Post-Bid
$300,000 CJ est. value
Greensburg, PA 15601

SCI Mahanoy - Replace Roofs on Various Buildings
Renovation
Results
$1,533,800 CJ est. value
Frackville, PA 17931

Last Updated 02/09/2023 06:39 AM
Project Title

SCI Greene - Central Utility Plant Upgrade

Physical Address View project details and contacts
City, State (County) Waynesburg, PA 15370   (Greene County)
Category(s) Government/Public
Sub-Category(s) Prison/Jail
Contracting Method Competitive Bids
Project Status Results, Construction start expected February 2024
Bids Due View project details and contacts
Estimated Value $4,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This Project includes: PROFESSIONAL SELECTIONS. PROJECT TITLE: SCI Greene CUP Upgrade BRIEF DESCRIPTION: The scope of work includes, prioritizing the systems in the Central Utility Plant (CUP) and then refurbish, restore or replace these systems and components based on available and acquired funding. The Department of General Services Public Works and the Bureau of Diversity, Inclusion and Small Business Opportunities identified this procurement as eligible for the setting of Small Diverse Business (SDB) and/or Veteran Business Enterprise (VBE) participation goals. Applicants now must agree to meet the SDB and VBE Participation Goals in full or demonstrate that they have made Good Faith Efforts to meet the Goals. Refer to the project e-builder solicitation folder for instructions regarding Small Diverse Business and Veteran Business Enterprise participation. The Goals for SDB participation: 14% The Goals for VBE participation: 3% ADDITIONAL REQUIREMENTS OF SHORT-LISTED FIRMS The following information will need to be provided: detailed resumes for key design and management personnel with references; the firm's approach to the project, including descriptions of tasks and scope of services, and an explanation of how the approach provides value to the Commonwealth; a detailed description from the firm's portfolio of a project that illustrates the firm's ability to translate design intentions into a solution that meets the client's needs and expectations; an organizational chart and detailed work plan, identifying key personnel roles and percent of time assigned to the project; an explanation of how the firm assures high quality bidding documents; examples of relevant projects completed by the lead design professional and key personnel, with contact information for references for these projects; an assessment of key project issues and risks to the project; identification of special investigations, studies or testing that may be required; a description of how diversity will be accomplished within the team; evidence of financial capability; a list of professional liability claims and/or legal actions within the last ten years and a non-binding fee proposal. Gas fired boiler & electric chillers replacement and/or refurbishment. o Hot and chilled water circulation pump and control replacement and/or refurbishment. o Replacement of cooling systems and manifold of cooling towers. o Plant master and motor control replacement or refurbishment. o All commissioning, start up and regulatory compliance. MBE (14%), WBE (14%), DVBE (3%)

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents