Similar Projects
Reported | 07/13/2021 12:00 AM |
Project Title | Tuckahoe UFSD Construction Management Services |
Physical Address | View project details and contacts |
City, State (County) | Tuckahoe, NY (Westchester County) |
Category(s) | Education |
Sub-Category(s) | Elementary School, Middle/Senior High School |
Contracting Method | Competitive Bids. Construction Management - CM at Risk. |
Project Status | Request for Proposals (RFPs) |
Bids Due | View project details and contacts |
Estimated Value | $9,900,000 |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Cafeteria Renovation & Expansion – Cottle Elementary School Cafeteria Renovation & Expansion – 2. Fixture & Finish Upgrades for 2 oldest toilet rooms at Cottle Elementary School 3. Proposed Playground Improvements 4. Proposed Siwanoy Boulevard Improvements Infrastructure Upgrades - Cottle Elementary School Replace Corridor Ceilings • Update balance of fire alarm system • Abate existing Asbestos Containing Materials above corridor ceilings. • The older classrooms in Cottle will be provided with a dedicated outside air system with Energy Recovery and MERV 13 filtration. This unit will provide 100% outside air – no recycled air. Cooling will be provided partially by this outside air unit but mostly through separate wall or ceiling mounted variable refrigerant flow (VRF) units with individual controls in each classroom. Athletic Field Renovation (including installation of artificial turf) - Cottle Elementary School Siwanoy Blvd. Improvements – Cottle Elementary School. Cafeterial and Library Renovations - MS/HS Building. Air Conditioning – New Wing MS/HS Building Infrastructure Upgrades – MS/HS Building Proposed Library improvements – 2. Proposed Cafeteria Improvements – 3. New Wing Air conditioning – HVAC units retrofitted and or replaced to provide air conditioning and a higher level offiltration (MERV 13). 4. The older classrooms will be provided with a dedicated outside air system with Energy Recovery and MERV 13 filtration. This unit will provide 100% outside air – no recycled air. Cooling will be provided partially by this outside air unit but mostly through separate wall or ceiling mounted variable refrigerant flow (VRF) units with individual controls in each classroom. |
||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |