Similar Projects
Masterplan Contract 1 Water Well
Infrastructure
Bidding
Cheneyville, LA

Furnish and Install Rotating Assembly Pump, Repair Existing Drive Cedar Grove
Infrastructure
Bidding
$114,000 est. value
Shreveport, LA

FLYGT Pump
Infrastructure
Post-Bid
Slidell, LA

Purchase of Chopper Pumps
Infrastructure
Post-Bid
Gretna, LA

Chiller Pumps Replacement at the Municipal Auditorium
Infrastructure
Results
$38,500 est. value
Shreveport, LA

Removal of Existing Vacuum Pumps and Furnish, Install and Startup of New Vacuum Pumps
Infrastructure
Results
Marrero, LA 70072

Purchase of 12 Centrifugal Pumps for the Jefferson Parish Department of Drainage
Infrastructure
Bidding
Gretna, LA

Improvements to Causeway Boulevard and Scott Street Sewer Lift Station
New Construction, Infrastructure
Post-Bid
Gretna, LA

Vertical Turbine Solids Handling (VTSH) Pump and Motor
Infrastructure
Results
Gretna, LA

Sump Pumps
Alteration
Bidding
Baton Rouge, LA

8-Inch Portable Water Pump
Infrastructure
Post-Bid
Convent, LA

Controller Pumps for Jefferson Parish Public Works Warehouse
Infrastructure
Results
Gretna, LA

171 Tsurumi Pumps
Infrastructure
Post-Bid
Hahnville, LA

LA 182 University PS Pump 2 Motor Rehabilation
Infrastructure
Results
$50,000 est. value
LA

131 - Repair and/or Installation of Pumps and Related Equipment and Plant Maintenance
Infrastructure
Post-Bid
Hahnville, LA

Reported 08/24/2021 12:00 AM
Project Title

Red River Remove, Cap and Drill Two New Water Well

Physical Address View project details and contacts
City, State (County) Bossier City, LA 71112   (Bossier County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $45,000 to $56,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Services required: 1) Excavate, disassemble, remove and cap off the existing two wells and casing 2) Drill, construct, and install two new wells. Well #1 consist of the following specs: One 10’ X 6” 20HP (three phase) Submersible Well (1,000 GPM range) with a 6” Check valves and 480 Volt Panel. Well #2 consists of the follow specs: One 12 X 6” line shaft turbine well (1,000 GPM Range) with a 6” check valve for discharge 3) One new gear head with minimum specs as follows: 40HP Gear drive 1-1 Ratio with 41x36 Driveshaft. 4) 2,200 feet of 10” 80 PSI Underground pipe (installed); five 10” Risers Complete; one 10” 90 PVC elbow PIP GxS; three 10” Line Tees GxSxG; three 10” PIP End Plugs 80 PSI PVC; two 16” steel surge Tanks (installed beside wells) **Contractor will supply all materials, equipment, and labor**

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents