Similar Projects
CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

Sewer and AC Water Group 765A
Infrastructure
Bidding
$16,300,000 est. value
San Diego, CA

Tempered Water Line Replacement Services
Infrastructure
Bidding
$200,000 est. value
CA

Valve - Leveling, Rear, C/S and S/S
Infrastructure
Sub-Bidding
Los Angeles, CA

Valve Inspection Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Santa Clara, CA

Professional Engineering Services For Water System Improvements In Madera County Maintenance District No. 36 Eastin Arcola
Infrastructure
Post-Bid
Madera, CA

8-Inch and 12-Inch Ductile Iron Water Main Replacement
Infrastructure
Results
$7,500,000 to $9,000,000 est. value
San Francisco, CA

Renovation of the Existing Underground Steam Distribution System
Infrastructure
Results
$13,222,600 est. value
Yountville, CA 94599

Replace Drakesbad Water Main/Access Road, NPS-Lavo
Term Contract
Bidding
$250,000 to $500,000 est. value
Chester, CA 96020

Locating Subsurface Facilities
Alteration
Post-Bid
Riverside, CA 92519

Hydronic Valve Replacement
Infrastructure
Results
Channel Islands Beach, CA

NVTA Sheehy Court 36-Inch Replacement Project
Infrastructure
Bidding
$400,000 est. value
Napa, CA 94558

Water System Repair
Alteration
Post-Bid
Placerville, CA 95667

North Long Beach Collection Main Control Valve Upgrade
Infrastructure
Results
$1,116,000 est. value
Long Beach, CA 90899

Reported 05/11/2022 12:00 AM
Project Title

Motherlode Force Main Replacement Phase 3A

Physical Address View project details and contacts
City, State (County) CA   (El Dorado County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $3,900,000
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The Work consists of: replacement of approximately 5600 linear feet of 18-inch sewer force main pipe and associated appurtenances. Bidding Documents contain the full description of the Work.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents