Similar Projects
Water System Improvement
Infrastructure
Bidding
Ludowici, GA

SR 92 North Water and Sanitary Sewer Relocation
Infrastructure
Bidding
GA

Southbridge Infrastructure Improvements
Post-Bid
GA

Westside Business Park Infrastructure Expansion Phase 3
Post-Bid
Bemiss, GA 31602

Walking Trail at Meridian Park
Results
Loganville, GA 30655

2019 CDBG Water System Improvements
Results
Milan, GA 31060

Kipp Vision Modular Health Clinic
New Construction
Construction
Atlanta, GA 30315

Ariston Retail - Civil Package
New Construction, Infrastructure
Construction
Buford, GA 30519

2021 Water Service Line Replacement
Infrastructure
Bidding
Stockbridge, GA

Construction of the Uchee Creek Campground Northwest Loop Water Main
Post-Bid
Columbus, GA 31901

Creekside S/D Main Extension
Results
Social Circle, GA

Waterline Extension - Crestview Drive and Walkabout Creek Road
Infrastructure
Bidding
$100,000 est. value
Morganton, GA 30560

Heron Bay Force Main D
Post-Bid
Marietta, GA

New Water Meter Installation Project
Results
Less than $1,960,250 est. value
Gainesville, GA 30501

Solid Waste Site Improvements
Infrastructure
Bidding
$800,000 to $1,000,000 est. value
Hamilton, GA 31811

Reported 04/15/2022 12:00 AM
Project Title

Outfall (NPRL) Line Extension to Taylors Creek

Physical Address View project details and contacts
City, State (County) Hinesville, GA   (Liberty County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: The work to be performed consists of furnishing all labor and materials to complete the Non-Potable Reuse Line Extension to Taylors Creek. More specifically, the project will consist of connecting to an existing 12 non-potable reuse line (NPRL) and constructing 5775 LF of NPRL (3580 LF of trenched 16 PVC NPRL, 450 LF of 16 PVC directional bore, 1225 LF of 24 PVC directional bore, and 165 LF of 20 PVC directional bore with 16 fusible PVC carrier pipe) ending at Taylors Creek, installation of all necessary valves, fittings and meters, two concrete valve vaults, repurposing an existing SCADA panel for use along the NPRL extension, one Low Profile Cascade Aerator with concrete structure, and a concrete end treatment for the 24 discharge into Taylors Creek.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents