Similar Projects
West Water Tower Coating
Infrastructure
Bidding
Cokato, MN

2021 Cleaning, Repairing, Painting 1,500,000 Gallon Elevated Water Storage Tank, Tower Number One
Post-Bid
Golden Valley, MN

Regional Drinking Water Project Contract C - Elevated Water Tower
New Construction
Post-Bid
Cloquet, MN 55720

Park Glen Road Water Tower Rehabilitation
Results
Saint Louis Park, MN 55416

Water Storage Tank Rehabilitation
Results
Less than $1,120,820 est. value
Minnetonka, MN

MPCA: Condensate Tank Repair
Renovation
Post-Bid
Hopkins, MN 55343

Chattanooga Water Tower
Results
$700,000 est. value
Saint Charles, MN

Wheel Loader Broom, Sprayer, and Water Tank System
Term Contract
Post-Bid
Crookston, MN

Cope Avenue Tank Repairing and Painting
Results
Saint Paul, MN 55109

2500 Gallon Double Wall Tanks
Infrastructure
Post-Bid
Willmar, MN

Water Tower Coatings
Results
$300,000 to $400,000 est. value
Fairmont, MN

Domestic Hot Water Storage Tank Replacement at Iowa Hi-Rise
Infrastructure
Post-Bid
Saint Paul, MN 55106

Water Storage Tank Rehabilitation-Railway Street Elevated Tank
Results
Waldorf, MN 56091

2021 Water Tower Rehabilitation
Infrastructure
Post-Bid
$275,000 est. value
Badger, MN 56714

1 Million Gallon Composite Elevated Water Tower
Results
Le Sueur, MN

Last Updated 02/28/2022 04:47 PM
Project Title

Water Tower Coatings

Physical Address View project details and contacts
City, State (County) Truman, MN   (Martin County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. Full exterior coatings removal and replacement. 2. Full curtain containment for exterior work. 3. Full interior coatings removal and replacement. 4. Miscellaneous vent, safety climb, recirculation pump, and other equipment replacement.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 09 - Finishes, Painting.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents