Similar Projects
New Booster Pump Station for SF/150 - Catawba County
New Construction
Conception
$1,600,000 est. value
Newton, NC

Lift Station Renovations - Town of Morehead City
Renovation
Conception
$1,050,000 est. value
Morehead City, NC

The Copper District Phase II - Force Main Project
New Construction
Design
Clayton, NC

VinFast Electric Vehicle Manufacturing Facility - Triangle Innovation Point East
New Construction, Infrastructure - 2,809,338 SF
Design
$4,000,000,000 CJ est. value
Moncure, NC 27559

P-239 Flightline Utility Modernization-Phase II
Renovation, Infrastructure
Bidding
$250,000,000 CJ est. value
Cherry Point, NC 28533

RFQ Engineering - Edgecombe County Water and Sewer
Infrastructure
Bidding
$500,000 CJ est. value
Tarboro, NC 27886

Eden Remediation Program Contract IIA - Bridge Street Pump Station Rehabilitation
Renovation
Post-Bid
Eden, NC

The Copper District - Lift Station and Force Main Project - Phase I
New Construction
Post-Bid
Clayton, NC

Clinton Waste Water Treatment Plant Resiliency Improvements
Renovation, Infrastructure
Results
$5,240,100 CJ est. value
Clinton, NC 28328

Lift Station 7022 Flow Meter
Renovation
Results
$25,000 to $100,000 est. value
Cherry Point, NC 28533

RFQ D/B - Pump Station Rehabilitation Shamrock Pump Station-33 Suncourt Villas Pump Station-114
Renovation
Pending Verification
$825,000 CJ est. value
Wilmington, NC 28403

Northern Regional Pump Stations and Force Mains, Phase B
Infrastructure
Pending Verification
$1,535,750 CJ est. value
Wilmington, NC 28403

Dixie Berryhill Water and Sewer Projects - City of Charlotte
New Construction, Infrastructure
Conception
$3,920,000 est. value
Charlotte, NC

Public Water and Wastewater Systems - Gates County
Renovation, Infrastructure
Design
$11,210,000 CJ est. value
Gatesville, NC 27938

Eastside Waste Water Treatment Plant (WWTP) UV Disinfection Upgrade and Primary Clarifier Pump Station Improvements
Renovation, Infrastructure
Bidding
$4,400,000 CJ est. value
Jamestown, NC 27282

Last Updated 07/18/2023 10:03 AM
Project Title

Bear Creek Pump Station Improvements

Physical Address View project details and contacts
City, State (County) Mocksville, NC 27028   (Davie County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations
Contracting Method Competitive Bids
Project Status Results, Construction start expected June 2022
Bids Due View project details and contacts
Estimated Value $356,796 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The Project consists of improvements to the Bear Creek Pump Station including the addition of a third pump and associated electrical equipment. Bids will be received for a single prime Contract. Bids shall be on a lump sum or unit price basis as indicated in the Bid Form. Bid security shall be furnished in accordance with the Instructions to Bidders. For information regarding this project please contact: Sydnee Potter Willis Engineers 10700 Sikes Place, Suite 115, Charlotte, NC 28277 Phone: 704-338-4667 Email: sydnee@willisengineers.com

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents