Similar Projects
Central Square Mixed-Use Development
New Construction, Build-out, Infrastructure
Design
$20,000,000 CJ est. value
Chelmsford, MA 01824

Cambridge Street Mixed-Use Development
Demolition, LEED Certification, New Construction, Infrastructure - 19,615 SF
Design
$3,000,000 CJ est. value
Cambridge, MA 02141

727 Massachusetts Avenue Hotel Addition
Addition, Demolition, Renovation, Infrastructure - 51,250 SF
Post-Bid
$20,000,000 CJ est. value
Boston, MA 02203

RFP Design - Construction of an Combined DPW and School Maintenance Facility
New Construction, Infrastructure
Post-Bid
$25,100,000 CJ est. value
Tewksbury, MA 01876

DPW Facility Salt Shed Locus Map Replacement Project
Demolition, New Construction, Infrastructure
Results
$1,543,950 CJ est. value
Melrose, MA 02176

Salt Shed Replacement - Sub
Demolition, New Construction, Infrastructure
Results
$128,200 CJ est. value
Melrose, MA 02176

New Compound Semiconductor Lab/Microsystem Integration Facility (CSL/MIF)
Demolition, New Construction, Infrastructure - 160,000 SF
Construction
$276,858,491 CJ est. value
Hanscom AFB, MA 01731

New Compound Semiconductor Lab/Microsystem Integration Facility (CSL/MIF)
Demolition, New Construction, Infrastructure - 160,000 SF
Construction
$276,858,491 CJ est. value
Hanscom AFB, MA 01731

Project Echo / CRG Hopping Brook
New Construction, Infrastructure - 550,000 SF
Pending Verification
$60,000,000 CJ est. value
Holliston, MA 01746

Chestnut Street Multi Residential
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Newton, MA 02464

Kendall Square Redevelopment Commercial Building D
New Construction, Infrastructure - 287,000 SF
Design
$67,000,000 CJ est. value
Cambridge, MA 02142

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Water Pipe and Main Shut-Off Replacement - General Bids
Infrastructure
Results
$118,825 est. value
Winchester, MA 01890

Galen Street Life Sciences Buildings - Phase 1
LEED Certification, New Construction, Infrastructure - 242,000 SF
Construction
$65,000,000 CJ est. value
East Watertown, MA 02472

Isobel Lofts
Demolition, New Construction, Infrastructure - 33,943 SF
Pending Verification
$6,000,000 CJ est. value
Lowell, MA 01852

Last Updated 05/30/2023 04:11 PM
Project Title

Victor Drive Water Main Replacement Project

Physical Address View project details and contacts
City, State (County) Tewksbury, MA 01876   (Middlesex County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $561,642 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

For Victor Drive Water Main Replacement Project The work involves the following major item (s): Installation of approximately 1,500 linear feet of 8" Molecularly Oriented Polyvinyl Chloride (PVCO) water main, 110 linear feet of 8" and 6" ductile iron water main, approximately 110 linear feet of HDPE service piping, fittings, fire hydrants, ductile iron gate valves, temporary water main bypass and other related water system work on Victor Drive. Additional work includes approximately 1,000 square yards of temporary trench paving and 1,350 square yards of mill and overlay trench pavement, and all other related work as specified. All items related to the water main replacement and temporary trench paving shall be completed within 60 calendar days during June to August 2023 while the John W. Wynn Middle School is on summer vacation. The John W. Wynn Middle School tentatively has its last day of school on June 23, 2023. This date may be adjusted based on the actual number of snow days utilized. BID SECURITIES shall be in amount of 5% of the bid and in the form of a certified check drawn upon a bank within the State of Massachusetts or a bid bond executed by a surety company authorized to do business in Massachusetts, made payable to the OWNER. The successful bidder must furnish a 100% PERFORMANCE and PAYMENT BOND and will be required to execute the Contract Agreement within ten (10) days following notification of the acceptance of his Bid. The OWNER reserves the right to reject any or all bids, to accept any bid, to waive any informality on bids received, and to omit any item or items deemed advisable for the best interests of the OWNER. Bids are subject to Massachusetts-M.G.L. Chapter 30-Section 39M and to Massachusetts minimum wage rates as required by M.G.L. Chapter 149- Sections 26 to 27D inclusive. The award of the contract is contingent upon the availability and appropriation of funding by the Town. All costs associated with the preparation of the bids shall be the responsibility of the bidder, regardless of whether or not the Contract is awarded. The successful bidder shall certify that all employees at the worksite will have successfully completed a course in construction safety and health approved by the U.S. Occupational Safety and Health Administration (OSHA) that is at least 10 hours in duration at the time the employee begins work and who shall furnish documentation of successful completion of said course with the first certified payroll for each employee. MassDOT prequalification of contractors with the class of work as, Sewer & Water, for the project Question Deadline 05/03/2023 at 2:00 PM ET

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents