Similar Projects
Design/Build Services HVAC System Bldg 1326, Eglin AFB
Design
$1,000,000 to $5,000,000 est. value
Eglin AFB, FL

J045--Replacement of 4 Liebert A/C units on ground floor of the St Petersburg VARO
Term Contract
Bidding
$100,000 to $250,000 est. value
Saint Petersburg, FL 33708

HVAC Renovations at Patronis Elementary School
Alteration
Bidding
Panama City, FL 32408

WMFE FM 90.7 Building - HVAC Repair - Mold Remediation
Renovation, Alteration - 2,500 SF
Sub-Bidding
Orlando, FL 32817

Mechanical Renovations at Horizon Middle School & Kissimmee Middle School
Post-Bid
Less than $1,900,000 est. value
Kissimmee, FL 34746

Library Gruber Sandbox Building LY - 3
Post-Bid
Boca Raton, FL 33431

PBSO District 3 - HVAC Replacement
Term Contract
Results
West Palm Beach, FL

MCCH - HVAC Replacement AHU #27
Term Contract
Results
West Palm Beach, FL 33401

Remove and Replace Two Existing Air Cooled Chillers at Hardee Junior High/Hilltop Elementary School
Alteration
Bidding
Wauchula, FL 33873

Pahokee Housing Authority Padgett Island / Fremd Village HVAC Project
Post-Bid
Pahokee, FL 33476

Replace Chillers and Air Handlers, Multi-Facilities
Results
$500,000 to $1,000,000 est. value
Homestead, FL 33039

Key West Lighthouse Ticket Counter HVAC, Ducting, and Insulation Upgrades
Alteration
Bidding
FL

Multi-Year Contract for HVAC/Energy Maintenance and Construction
Term Contract
Post-Bid
FL

FSU Facilities and FSU Mag/Lab HVAC PM and Minor Repairs Services
Results
Tallahassee, FL

N059--FY20: Hot Deck Replacement
Post-Bid
Gainesville, FL 32608

Reported 06/03/2021 12:00 AM
Project Title

Eglin AFB - Install Humidity Control FMS Pods at Bldg 1416

Physical Address View project details and contacts
City, State (County) Eglin AFB, FL   (Okaloosa County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Accepting Letters of Interest
Bids Due View project details and contacts
Estimated Value $500,000 to $1,000,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The intent of this project is to provide humidification to each of the ten (10) FMS pods in order to maintain the proper conditions. The humidity in each of the pods shall be maintained between 65 deg – 71 deg and 40% - 60% at all times. Modifications to the heating, ventilation and air conditioning system (HVAC) shall be in accordance with F-35 Lightning II Facilities Requirements Document, Section 4: Training Facility Requirements.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment, Humidity Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents