Similar Projects
Astoria Sanitary Sewer Rehabilitaion
Infrastructure
Bidding
$500,000 CJ est. value
Astoria, IL 61501

Headwall Removal and Replacement
Infrastructure
Bidding
$600,000 CJ est. value
Avon, IL 61415

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

RR-21-4821 Pavement Repairs
Infrastructure
Results

2022 Cuba Road District - II
Infrastructure
Results
$188,963 CJ est. value
Cuba, IL 61427

RFQ - Various Phase I/II Projects, Various Routes, Various Counties
Term Contract
Post-Bid
$4,000,000 CJ est. value
Dixon, IL 61021

Red Ember Remedial Reclamation
Infrastructure
Results
$300,000 est. value
IL

Parking Lot Pavement Resurfacing at the Fulton County Jail
Infrastructure
Post-Bid
$300,000 est. value
Lewistown, IL 61542

Spray Patching
Infrastructure
Results
$56,269 CJ est. value
Canton, IL 61520

Salt and Gravel Storage Structure
New Construction, Infrastructure
Post-Bid
$50,000 CJ est. value
Vermont, IL 61484

Agricultural Management, Agricultural Fieldside Mowing, And Fence Installation and Repair At Fulton County, Illinois
Infrastructure
Results
$330,072 CJ est. value
Cuba, IL 61427

Deliver and Install Proposal of Road Repair
Infrastructure
Post-Bid
$300,000 CJ est. value
Lewistown, IL 61542

Culvert Extension
Infrastructure
Post-Bid
$500,000 CJ est. value
Canton, IL 61520

Furnish and Apply
Infrastructure
Post-Bid
$500,000 CJ est. value
Fairview, IL 61432

Last Updated 04/14/2023 01:02 PM
Project Title

Parking Lot Paving

Physical Address View project details and contacts
City, State (County) Table Grove, IL 61482   (Fulton County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Middle/Senior High School, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The board of education is not obligated To accept the lowest dollar bid and reserves the right to reject any and All bids or to waive any informalities, irregularities, technicalities, or Defects in any bid should the board deem it in the best interest of the School district to do so. The Work of Project is defined by the Contract Documents and consists of the following: 1. New parking lot paving

Details

Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents