Similar Projects
2021 Downtown Sidewalk Replacement
Infrastructure
Bidding
Farmington, MN

TLLC 2021 Parking Lot Improvements
Infrastructure
Bidding
$422,859 est. value
Farmington, MN 55024

Century Middle School Pool Addition - Bid Package 4 - Parking Lot
Post-Bid
Lakeville, MN 55044

Big River Regional Trail Mendota Trailhead
Post-Bid
$1,400,000 est. value
Mendota Heights, MN 55120

2021 Parking Lot Rehabilitation
Results
$250,000 to $300,000 est. value
Inver Grove Heights, MN

Traffic Control Signal System and ADA Improvements
Results
Eagan, MN 55120

Downtown M&O and General Sidewalk
Term Contract
Post-Bid
Saint Paul, MN

Steve Michaud and Rolling Oaks Parks Parking Lot and Trail Improvements
Results
$625,000 est. value
Lakeville, MN 55044

Eagandale Industrial Park Street and Stormwater Quality Improvements
Post-Bid
$2,095,000 est. value
Eagan, MN

2021 Street Rehabilitation
Results
$6,500,000 est. value
Lakeville, MN

Phase II Phalen Transportation Improvements
Renovation
Post-Bid
Saint Paul, MN

2021 Street Improvement
Results
$2,500,000 to $3,500,000 est. value
Burnsville, MN

PW-Jefferson St Paul Pedestrian Improvements 2021
Post-Bid
Saint Paul, MN

Highview Avenue Improvement
Results
$1,500,000 to $1,700,000 est. value
Lakeville, MN 55024

Maple Island Road Sanitary Sewer and Trail Improvements
Infrastructure
Post-Bid
$950,000 est. value
Burnsville, MN 55306

Last Updated 06/07/2021 04:59 PM
Project Title

2021 Eagan Citywide Trail and Parking Lot Improvements

Physical Address View project details and contacts
City, State (County) Eagan, MN   (Dakota County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Trail & parking lot mill & bituminous overlays, site grading, curb & gutter repairs, misc. utility adjustments/repairs, restoration. 1 LS Traffic Control 1 LS Remove Trail Overgrowth 136 CY Common Excavation 527 TN Class 5 Aggregate Base 1,255 S.Y. Mill Bituminous Pavement 476 S.Y. Remove Bituminous Pavement 22,735 S.F. Remove Bituminous Trail Pavement 20 S.F. Remove Concrete Dwy / Valley Gutter 340 L.F. Concrete Curb & Gutter Removal & Replacement 700 S.F. 4” & 6” Concrete Sidewalk Removal & Replacement 2 EACH Adjust Frame & Ring Casting (CB) – HDPE Rings 48 S.F. 2x2 Truncated Domes 1,300 TN Wear Course Bit. SP Mixture 526 GAL Bit. Material for Tack Coat 260 CY Boulevard Topsoil Borrow 2,350 S.Y. Seed & Hydromulch 211,000 GAL Water for Turf Establishment

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents