Similar Projects
FY22 Airport Operations Modifications and T Hanger Project - Filed Sub-Bids
Renovation
Results
$4,800,000 est. value
Barnstable, MA

Airport Terminal Admin Building Project - City of Pittsfield
New Construction, Infrastructure
Conception
$14,000,000 CJ est. value
Pittsfield, MA 01201

Terminal Space Optimization Project
New Construction
Results
Nantucket, MA

Owners Projects Manager (OPM) for Crew Quarters Project
New Construction
Results
Nantucket, MA 02554

Replacement of Backflow Preventer
Alteration
Results
$10,000 est. value
Nantucket, MA 02554

RFP Developer - Boston Logan International Airport Terminal E Lounge (New)
Build-out
Post-Bid
$3,000,000 CJ est. value
Boston, MA 02128

Symphony Station Accessibility Improvements
Post-Bid
$20,000,000 est. value
Boston, MA

RFP Developer - Boston Logan International Airport Terminal E Lounge (New)
Build-out
Post-Bid
$3,000,000 CJ est. value
Boston, MA 02128

5th Jet Fuel Tank Logan International Airport - Sub
Renovation
Results
$309,000 CJ est. value
Boston, MA 02203

5th Jet Fuel Tank at Logan International Airport - GC
Infrastructure
Results
$309,000 CJ est. value
Boston, MA 02128

Last Updated 12/09/2022 01:35 PM
Project Title

Terminal A Pre Check Checkpoint - Phase 2 - General Bid

Physical Address View project details and contacts
City, State (County) Boston, MA 02128   (Suffolk County)
Category(s) Transportation
Sub-Category(s) Airline/Passenger Terminal
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2023
Bids Due View project details and contacts
Estimated Value $1,800,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Terminal A Pre Check Checkpoint- Phase 2 project is a renovation of the temporary Terminal A Pre Check Checkpoint to include a curtainwall perimeter, new terrazzo flooring, new ceilings, and a new corridor through to the hold rooms. The Work Includes Erection of Temporary Security Partitions, Demolition of Existing Enclosures That Surrounds a Security Checkpoint Including but Not Limited to Temporary Partitions, Walls, Ceilings, and Floors; Construction of a New Glass Enclosure With Associated Roll Down and Hollow Metal Swinging Doors; Installation of Terrazzo and Carpet Floor Coverings; Installation of Framing and Walls Including Phenolic Panels; Installation of Accoustical Tile Suspended Ceilings; Installation of Electrical Lighting, Power and Security Systems, Fire Protection Sprinkler Systems, Plumbing, and Hvac Distribution Systems. The Contract Includes Steel Support, Caulking and Sealant, and Incidental Work. 1622-C2

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents