Similar Projects
Reported | 07/01/2021 12:00 AM |
Project Title | Engineering Services |
Physical Address | View project details and contacts |
City, State (County) | Beech Mountain, NC (Watauga County) |
Category(s) | Professional Services |
Sub-Category(s) | Engineering |
Contracting Method | Competitive Bids. |
Project Status | Accepting Qualifications |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Engineering firms to perform professional services related to the design and construction of the project will address the need for development of an Emergency Source Surface water supply reservoir. The project will require the joining of two existing lakes, Lake Coffey, and Lake Santos into an estimated 30-million-gallon capacity off-stream reservoir in the Pond Creek stream basin of Beech Mountain. Approximately 12,000 feet of 12 ductile iron pipe raw water main installation will be required to transfer the source water to the existing Buckeye Creek Water Treatment Facility including lift station. |
Details | |
Bidder's List | View project details and contacts |
Prospective Bidders | View project details and contacts |
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |