Similar Projects
Repairs to Mill Road Bridge
Bidding
Brentwood, NH 03833

Governor's Island Bridge - Expansion Joint Rehabilitation
New Construction, Infrastructure
Bidding
$300,000 to $350,000 est. value
Gilford, NH

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Sources Sought/Request for Information for Pre-Fabricated Trail Bridges
Post-Bid

Mason Street Bridge
Results
$250,000 to $300,000 est. value
Berlin, NH

Fabricated Steel Bridge Frames
Results
Concord, NH

Perch Pond Road Culvert Restoration Project
Infrastructure
Construction
$185,000 est. value
Campton, NH 03223

Adaptive Reuse of Danbury Bridge
New Construction
Post-Bid
Danbury, NH

Oyster River Pedestrian Bridge
Results
$90,000 to $110,000 est. value
Durham, NH

Stowell Road Covered Bridge
Renovation
Post-Bid
Merrimack, NH 03054

Bridge Preservation Work on Two Bridges, Br. No. 125/177 and Br. No. 173/141
Results
Less than $1,628,503 est. value
Bethlehem, Carroll, NH 03575

Bridge Preservation Efforts on the Church St. Over Conn. River between Walpole, NH to Rockingham, VT
Results
Less than $1,517,815 est. value
Walpole, NH 03604

Washington Street Bridge Rehabilitation Project
Results
$675,000 to $725,000 est. value
Concord, NH

Cornish Windsor Covered Bridge Scour Mitigation
Results
Less than $706,766 est. value
Cornish, Windsor, NH 03244

Lempster Coach Road Bridge Replacement Project
Results
Goshen, NH

Reported 01/20/2022 12:00 AM
Project Title

2022 Bridge Replacement

Physical Address View project details and contacts
City, State (County) Salem, NH 03079   (Rockingham County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $3,250,000 to $3,500,000
Plans Available from Municipal Agency - 12/16/21
Owner View project details and contacts
Architect View project details and contacts
Description

This work includes the replacement of the existing 25-foot long bridge with a 50-foot clear span cast-in-place concrete arched rigid frame and wingwalls with stone facing that carries Bridge Street over Spicket River in the Town of Salem, New Hampshire. Work also includes 610-feet of associated approach roadway work.

Details

Bridge, New Construction.
Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents