Similar Projects
New City Hall Complex
New Construction
Conception
Less than $5,700,000 est. value
Lake City, FL 32055

New City Hall
New Construction
Conception
$30,000,000 est. value
Clearwater, FL

North Dade Government Center, Landmark Site
- 15,500 SF
Design
$7,500,000 est. value
Miami, FL 33055

Judicial Center Renovations
Renovation, Addition - 21,356 SF
Design
Brooksville, FL 34601

RFP D/B - Column Abatement and Reconstruction, Paul G. Rogers Fed Bldg, W Palm Beach
Term Contract, Renovation, Infrastructure
Bidding
$5,000,000 CJ est. value
West Palm Beach, FL 33401

Alachua County State Attorney ADA Upgrades
Renovation - 730 SF
Bidding
$230,000 CJ est. value
Gainesville, FL 32601

City Hall
New Construction - 85,125 SF
Post-Bid
Largo, FL 33779

RPB Village Hall Construction Services
New Construction - 25,380 SF
Post-Bid
Less than $9,900,000 est. value
Royal Palm Beach, FL 33411

Ft Meyers Courthouse Roofing Building Enclosure Repairs
Renovation
Results
$1,000,000 to $5,000,000 est. value
Fort Myers, FL 33901

Juvenile Justice Courthouse
New Construction - 57,986 SF
Results
$10,000,000 est. value
Panama City, FL

New City Hall and Municipal Campus Improvements
- 120,000 SF
Construction
Sunrise, FL

New Northeast Polk County Government Center
New Construction - 70,000 SF
Construction
$16,000,000 est. value
FL

RFP Design - Design Services for the Clerk of Courts Winter Park Courthouse at Metric Drive
New Construction, Infrastructure
Pending Verification
$300,000 CJ est. value
Goldenrod, FL 32792

Fort MCcoy Building Renovation 1-11, 13-17
Addition
Pending Verification
$15,277,396 est. value
FL

County Office Renovate All Buildings
New Construction, Renovation
Conception
$3,480,000 est. value
FL

Last Updated 10/31/2022 03:05 AM
Project Title

Judicial Complex North Wing Exterior Elevators - Broward County

Physical Address View project details and contacts
City, State (County) Fort Lauderdale, FL 33301   (Broward County)
Category(s) Government/Public
Sub-Category(s) Capitol/Court House/City Hall
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected June 2025
Bids Due View project details and contacts
Estimated Value $2,073,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In FY20-21, $1,277,000 is allocated to design and construct an exterior elevator at the North Wing building to provide for private and secure transportation of in-custody juveniles. As of October 31, 2022, this project is currently in the FY 2023-2027 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents