Similar Projects
Robert Street Pedestrian-Bike Pathway - City of Cody
Infrastructure
Conception
$450,000 CJ est. value
Cody, WY 82414

Robert Street Pedestrian-Bike Pathway - City of Cody
Infrastructure
Conception
$450,000 CJ est. value
Cody, WY 82414

RFP Construction Manager at Risk Services - Construction of Heavy Equipment Maintenance Shop Park County Powell Landfill
New Construction, Infrastructure
Bidding
$650,000 CJ est. value
Powell, WY 82435

Roadside
Infrastructure
Bidding
$500,000 CJ est. value
Powell, WY 82435

WY NPD Yell 14(1) Lewis River Bridge
Term Contract
Post-Bid
Yellowstone National Park, WY

WY NPS Yell 10(23), Grand Loop Road - Old Faithful To West Thumb
Term Contract
Post-Bid
Yellowstone National Park, WY

District 5 Crack Seal
Infrastructure
Results

Rading, Bituminous Pavement Surfacing, Slide Stabilization Rock, Aggregate Columns, Temporary Concrete Barriers and Miscellaneous Work
Infrastructure
Results
WY

Rocky Mountain Granite
New Construction, Infrastructure - 5,000 SF
Pending Verification
$600,000 CJ est. value
Cody, WY 82414

Rocky Mountain Granite
New Construction, Infrastructure - 5,000 SF
Pending Verification
$600,000 CJ est. value
Cody, WY 82414

Infrastructure Improvements - East Sheridan Intersects with Beacon Hill Road
Infrastructure
Conception
$1,250,000 CJ est. value
Cody, WY 82414

Z--MATOC - IMR Bridges
New Construction
Post-Bid
$10,000,000 est. value

Grading, Milling Plant Mix, Bituminous Pavement Surfacing, Bridge Rehabilitation, Temporary Concrete Barrier, Guardrail And Miscellaneous Work
New Construction, Infrastructure
Results

Sweets Soda Shoppe
New Construction, Infrastructure - 502 SF
Pending Verification
$200,000 CJ est. value
Cody, WY 82414

Cody to Montana Wyoming 120 - 1502016 - Park County
Infrastructure
Conception
$2,863,000 CJ est. value
Cody, WY 82414

Last Updated 01/24/2023 11:15 PM
Project Title

WY NPS YELL 12(2) Yellowstone River Bridge

Physical Address View project details and contacts
City, State (County) Yellowstone National Park, WY 82190   (Park County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value $117,699,813 [brand] Estimate
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Award Details Contract Award Date: Jan 24, 2023 Contract Award Number: 69056719D000006 Task/Delivery Order Number: 69056723F00021N Contractor Awarded Unique Entity ID: FPM7V1ZC8WU2 Contractor Awarded Name: H-K CONTRACTORS, INC. Contractor Awarded Address: Idaho Falls, ID 83402-5879 USA Base and All Options Value (Total Contract Value): $117699813.00 https://ravallirepublic.com/news/state-and-regional/yellowstone-invests-155m-in-road-projects/article_bb634334-53bd-57f4-8326-4ebf063bcd3a.html Yellowstone River Bridge - Location: Near Tower Junction along the Northeast Entrance Road. Access: Anticipated to begin fall 2022 until fall 2025, expect up to 30-minute delays in this area year-round. The Yellowstone Picnic Area, Wrecker Curve access road and parking area will be closed during construction. Hiking trails will remain open in the area. Improvements: Built in the early 1960s, the deteriorating Yellowstone River Bridge will be replaced with a new bridge to preserve year-round safe visitor access to and from the Northeast Entrance and the communities of Silver Gate and Cooke City. The new bridge will be located 500 feet south of its existing location. Several new pullouts will increase viewing opportunities, trail and fishing access. Paved trailhead parking will be constructed for three local trails. The Yellowstone River Picnic Area will be reconstructed to accommodate increased visitor use. All three projects are funded through the Great American Outdoors Act and the Legacy Restoration Fund. Last year The park completed two major projects in 2021. After two years of construction and about $28 million invested, Tower-Roosevelt to Chittenden Road (near Dunraven Pass) will open May 27, depending on the weather. Additionally, with an investment of about $12 million, the North Entrance is now equipped to meet the challenges of increasing visitation and traffic with expanded visitor entrance capacity and modern facilities. With winter weather conditions possible for half of the year, there is a small window from April through early November for repairing and maintaining park roads and bridges. ____________________________________________________________________________________________________________________________________________________________________ PROJECT: WY NPS YELL 12(2) Yellowstone River Bridge LOCATION: 30 Miles East of Mammoth, WY WORK: This project consists of The project includes construction of a 1,285-foot long, 175-foot high steel girder bridge will have drilled shafts, concrete decking, sidewalks, and railing. The work includes demolition of the existing steel girder bridge upon completion of the new structure. LENGTH: 1 Miles ESTIMATED PRICE RANGE: Over $20,000,000 To view the INTERESTED VENDORS LIST you must register as an BETA.SAM user. Go to https://www.SAM.gov/. Scroll down to the "Vendors/Citizens" box. Click on "Register Now" and follow the directions. NOTICE OF SUBCONTRACTING OPPORTUNITY This project will be solicited to the Yellowstone/Grand Teton MATOC contractors. Information on the MATOC contractors may be found on our web site at: https://flh.fhwa.dot.gov/business/construction/idiq/ygt.htm PRELIMINARY PLANS and a letter with additional project information are in electronic format only and are posted with this synopsis. Registering at ADD TO WATCHLIST box insures notification when solicitation documents are posted. When solicitation documents are issued, the INVITATION FOR BIDS/REQUEST FOR PROPOSAL (specifications and plans) will be posted at this link. General and Technical Questions Regarding Proposed Work for This Project Will Be Accepted Until Close-of-business on 07/05/2022.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents