Similar Projects
Woodville Road Widening Phase 1 - Old Hearne to Texas Avenue - ST_ 15_ 001 - City of Bryan
Infrastructure
Conception
$5,440,000 CJ est. value
Bryan, TX 77803

Old Hearne Reconstruction (Wilkes to Woodville) Phase 3 and 5 - ST_ 11_ 002/ST_ 11_ 003 - City of Bryan
Infrastructure
Conception
$4,400,000 CJ est. value
Bryan, TX 77803

Villa Maria C Store
New Construction, Infrastructure - 3,971 SF
Design
$1,000,000 CJ est. value
Bryan, TX 77807

Hansen-Zak
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Bryan, TX 77801

BTU Administration Office
New Construction, Infrastructure - 37,000 SF
Post-Bid
$20,000,000 CJ est. value
Bryan, TX 77808

Texas A and M Business Education Complex
New Construction, Infrastructure
Post-Bid
$54,023,000 CJ est. value
College Station, TX 77845

Clearing, Grubbing, Detention and Mass Grading No. 2 Improvements for Southern Pointe Subdivision
Infrastructure
Results
$1,385,173 est. value
TX

Well Field Collection Line Rehab Phase 1
Renovation
Results
$694,151 est. value
College Station, TX 77842

Dutch Bros Coffee - University Drive (TX0305) / College Station
New Construction, Infrastructure - 930 SF
Construction
$500,000 CJ est. value
College Station, TX 77840

Reece Homes
New Construction, Infrastructure - 8,359 SF
Construction
$1,600,000 CJ est. value
Bryan, TX 77802

Pine Ridge Apartments
New Construction, Infrastructure - 13,571 SF
Pending Verification
$1,500,000 CJ est. value
College Station, TX 77840

Crossway Auto Center
New Construction, Infrastructure - 2,903 SF
Pending Verification
$246,755 CJ est. value
Bryan, TX 77808

WS Phillips Pkwy - GP Rd to Barron Rd Cut Off - City of College Stations
Infrastructure
Conception
$7,800,000 CJ est. value
College Station, TX 77845

Electrify America Ev Charging Stations College Station
Infrastructure
Design
$150,000 CJ est. value
College Station, TX 77840

CTE Complex Gate for the Bryan Independent School District
Infrastructure
Post-Bid
$120,000 CJ est. value
Bryan, TX 77807

Last Updated 07/21/2023 02:41 PM
Project Title

Wellborn SUD 2020 Water Supply and Distribution Improvements / Lightsey Plant Site

Physical Address View project details and contacts
City, State (County) Bryan, TX 77807   (Brazos County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2024 , Construction documents
Bids Due View project details and contacts
Estimated Value $3,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of a new water well site, electrical building and chemical buildings. As of July 21, 2023, design is complete. The project is pending numerous governmental approvals. An engineer has been selected. The project is tentatively scheduled to be advertised for public bid in January 2024. Although a firm timeline for construction has not been determined, construction is not anticipated to begin until the first quarter of 2024.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents