Similar Projects
Last Updated | 07/20/2023 08:03 AM |
Project Title | Mn-Litchfield Wetland Management District-HQ Cement Walkway Replacement |
Physical Address | View project details and contacts |
City, State (County) | Litchfield, MN 55355 (Meeker County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Paving/Reconstruction, Sidewalks/Parking Lot, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected July 2023 |
Bids Due | View project details and contacts |
Estimated Value | $25,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Litchfield WMD HQ Cement Walkway Replacement Litchfield WMD HQ replace damaged concrete pad and portion of walkway PLACE OF PERFORMANCE: Litchfield Wetland Management District 22274 615th Avenue. Litchfield, MN 55355 Meeker county, Minnesota PROJECT SCOPE: This is not a complete replacement but portions to be replaced are identified with aggregate finish and walkway portions as identified on attachment A statement of work. Objective is to replace cracked and settled cement slabs and reestablish grade to prevent water buildup at building. The approximate area to be replaced is 783 sq feet. Code(NAICS) for this acquisition is 238110-Poured Concrete Foundation and Structure Contractors with a Size Standard of $19M. Pursuant to FAR 36.204, the estimated Magnitude for the entire project is Less than $25,000. A formal Site Visit has not been scheduled but It is HIGHLY RECOMMENDED that contractors complete a site visit before submitting their quotes. Most measurements in the plans are best estimates based on mapping. Bids must include any mobilization or other related fees. The period of performance contemplated for this project is as follows: 7/22/2023 - 09/1/2023 Project must be completed by September 1, 2023. BASIS OF AWARD: Purchase Order will be based on the lowest priced offer and evaluation criteria per Attachment A. LIST OF ATTACHMENTS: Att. No. Attachment Description A Statement of Work B Wage Determination Tech POC: Todd Boonstra (320) 693-2849 Alt POC: Rick Schutz (320) 444-8917 Contracting POC: Sanford Carson sanford_carson@fws.gov Period of Performance: 07/22/2023 to 09/22/2023 |
||||
Details |
|
||||
Bidder's List | View project details and contacts | ||||
Prospective Bidders | View project details and contacts | ||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |