Similar Projects
Sunny Side Place Area Improvements
Infrastructure
Bidding
$378,000 CJ est. value
Randolph, WI 53956

Jones Island Water Reclamation Facility, Air Supply Unit 258-ASU-1 Intake Duct Repairs
Renovation
Sub-Bidding
$100,000 CJ est. value
Milwaukee, WI 53207

RFB for the replacement or repair of aerobic digester blowers and aeration basin blower
Renovation
Sub-Bidding
$500,000 CJ est. value
Antigo, WI 54409

District Wide Bottle Filler Stations - Bid Package 2
Alteration
Post-Bid
Milwaukee, WI 53228

Clarity Endcap Buildout
Renovation, Alteration
Post-Bid
Verona, WI 53593

Elevator Replacement, Roger Harring Stadium -MEP
Results
$675,000 est. value
La Crosse, WI 54601

Plumbing and Steamfitter Services at WVH-UG
Term Contract
Results

2022 Lead Service Line Replacement
Infrastructure
Construction
$581,013 CJ est. value
Hartford, WI 53027

Steam and Condensate Repairs
Renovation
Construction
$169,500 CJ est. value
Waupun, WI 53963

Jones Island Water Reclamation Facility, Building 47 Service Water Pump #5 Repairs
Infrastructure
Sub-Bidding
$300,000 CJ est. value
Milwaukee, WI 53207

Private Property Inflow And Infiltration Reduction Residential Plumbing Contractors
Term Contract
Post-Bid
Milwaukee, WI

Townhomes at Carver Park - Plumbing
Alteration
Results
Milwaukee, WI

Exterior Envelope Repair - Lathrop Hall and Van Vleck Hall
Renovation
Construction
$5,290,000 CJ est. value
Madison, WI 53706

Plumbing Services
Alteration
Post-Bid
Milwaukee, WI

Northwest Restroom Facility MEP
Renovation, Alteration - 3,500 SF
Results
$2,336,300 est. value
West Allis, WI 53214

Last Updated 04/09/2023 12:02 AM
Project Title

Lincoln Avenue Storm Water Lift Station and Upgrade - Contract B

Physical Address View project details and contacts
City, State (County) Fond du Lac, WI 54935   (Fond du Lac County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

Lincoln Avenue Storm Water Lift Station and Upgrade - Contract B Utilities: The work for which bids are requested shall include complete construction of a roadway and utilities needed for the upgrade of the proposed storm water lift station and demolition of the existing lift station(s). The project includes: project administration, private property pre- and post-construction surveys, construction limits protection, traffic control, erosion control, site grading, dewatering, yard piping, private electrical service upgrades, concrete side-walk, curb and gutter, asphalt paving, storm sewer construction, water main construction, sanitary sewer construction, restoration, etc. Bidders will be required to coordinate with multiple owner agents, owner finished equipment supplier, other contractors, and A/E. The anticipated Contract B will be substantial completion date is August 8, 2025 and final completion date is October 17, 2025. No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least 5% of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the bidder will execute and file the proper contract and bond within 15 days after the award of the contract. If after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdrawn within 60 days after the actual date of the opening thereof. OWNER reserves the right to waive any informalities or to reject any or all bids.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents