Similar Projects
Snydertown Borough WWTF Upgrade
Renovation, Demolition
Bidding
Snydertown, PA

Matsunk Water Pollution Control Center Garage/Maintenance Facility - General Construction
Infrastructure
Bidding
$650,000 to $700,000 est. value
King of Prussia, PA 19406

Wastewater System Relocation
Post-Bid
New Paris, Seward, PA 15554

Wastewater System Relocation
Post-Bid
New Paris, Seward, PA 15554

Install Two Single Residence Sewage Treatment Plants
Results
Erie, PA

Wastewater Treatment Plant Upgrade General
Results
$22,500,000 est. value
Rochester, PA 15074

Construction of Wastewater Treatment Plant Headworks Improvements - General
New Construction
Construction
$1,500,000 est. value
Phoenixville, PA 19460

Berks County Wastewater Treatment Plant Upgrade Project
Construction
Leesport, PA 19533

Trout Run and Matsunk WPCC Clarifier Modifications - General Construction
Infrastructure
Bidding
$500,000 to $550,000 est. value
King of Prussia, PA 19406

Furnishing, Delivery and Set Up for One (1) New 5 Ton 45' 6" Span, Rail & Conductor Bars
Post-Bid
McElhattan, PA 781290

WTP Aerator Installation Project
Results
Clymer, PA 15728

WWTP Phase II Improvements - General Construction
Construction
$5,000,000 to $5,500,000 est. value
West Chester, PA 19380

Wastewater Treatment Plant UV Disinfection Replacement
Infrastructure
Bidding
Youngsville, PA

Smithville POTW UV Disinfection Improvements Project
Post-Bid
Wellsboro, PA

Phase III Wastewater Collection System Project
Results
PA

Reported 05/27/2021 12:00 AM
Project Title

Avonmore Sewage Treatment Plant Replacement - General/Mechanical Construction

Physical Address View project details and contacts
City, State (County) Avonmore, PA 15618   (Westmoreland County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

General/Mechanical: Construction of new pre-cast, post-tensioned concrete treatment tanks, new laboratory and blower building and appurtenances and refurbishment and modification of the existing plant structures and equipment.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Humidity Control Equipment, Mechanical Dehumidification Units.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents