Similar Projects
2022 Seal Coating Program
Infrastructure
Bidding
$90,000 est. value
Fond du Lac, WI

2022 Mill and Overlay Program
Infrastructure
Bidding
$350,000 est. value
Fond du Lac, WI

LRIP Maple Drive - 2021 Road Project
Post-Bid
Campbellsport, WI 53010

LRIP Pulverizing and Repaving
Post-Bid
WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Fond du Lac - Plymouth, USH 151 - Seven Hills Road
Results
Fond du Lac, Plymouth, WI

Road Work
Infrastructure
Post-Bid
Campbellsport, WI

Bechaud Avenue and Polk Street Improvements - Roadway Construction
Results
North Fond du Lac, WI 54937

Fond Du Lac - Chilton, Drainage Way Culvert Replacement
Infrastructure
Post-Bid
$750,000 to $999,999 est. value
WI

Newton Avenue and Rock Avenue Reconstruction - Phase 1
Results
Waupun, WI 53963

2022 Road/LRIP Project Bids
Infrastructure
Post-Bid
Ripon, WI

2021 Street and Utility Construction
Results
Fond du Lac, WI

2022 Road Repair
Term Contract
Post-Bid
$300,000 est. value
Waupun, WI

Dix Road Roadway Reconstruction
Results
Mount Calvary, WI 53057

Multiple Street Reconditioning 2022
Infrastructure
Post-Bid
$1,190,000 est. value
Ripon, WI

Reported 05/17/2022 12:00 AM
Project Title

Highway Projects for 2022

Physical Address View project details and contacts
City, State (County) Rosendale, WI   (Fond du Lac County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected June 2022
Bids Due View project details and contacts
Estimated Value $400,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Town of Springvale, Fond du Lac County is accepting bids for the following highway projects for 2022 which are for cold mix paver wedging/overlay and hot oil seal coating Raube Road - (Cty Road M to Church Road) 3,980ft. (.753) by 20ft. Raube Road - (Church Road West one mile) 5,280ft. (1.00) by 20 ft. Pommering Road - (Metovale to corner) 6,500ft. (1.23) by 20ft. Schmoldt Road - (Corner to West) 2,000ft (.38) by 20ft. Liner Road - (Metovale Road East to gravel) 1,500ft. (.285) by 22ft. Center Road - (Davis intersection to North) 4,900ft. (.93) by 20-21ft. Center Road - (Konow north to Huth Drive) 3,900ft. (.74) by 20-21ft. Schmoldt Road - (near Cty Road M end) 75ft. Culvert cut/cold mix full-wedge Bell School Road - (near Center Road end) 75ft. Culvert bump/cold mix full-wedge The bid should include the tons of cold mix to be used and specify the type of chip seal process and the price per ton for cold mix paver patching and price per ton for cold mix hand patching For details call 920 375- 6055 The Town of Springvale reserves the right to accept or reject any or all bids and will not allow subcontracting.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents