Similar Projects
2020 Street and Utility Improvements Project
Post-Bid
Less than $3,400,000 est. value
Mathis, TX

Seal Coating
Results
Sinton, TX 78387

Road Improvement Program
Post-Bid
Sinton, TX

Phase 11 Paving Improvements (Part 1B Bicycle Lanes Striping)
Results
Portland, TX 78374

Widen Freeway
Results
Less than $81,846,848 est. value
TX

Conn Brown Harbor Road Construction Project
Results
Aransas Pass, TX 78336

SH0188 - Flexible Base
Bidding
$245,000 est. value
TX

Phase 11 - Paving Improvements (Part 1A - Seal Coats & Overlays)
Results
$1,600,000 est. value
Portland, TX 78374

Southern Region Disaster Recovery Support BPA
Results

Crack Seal Sinton Area Office
Results
Less than $293,078 est. value
TX

Safety Treat Fixed Objects
Results
Less than $826,013 est. value
TX

Avenue A Roadway Reconstruction and Waterline Replacement
Results
Less than $2,388,161 est. value
Ingleside, TX 78362

Purch and Del of Dense-Grade Hot-Mix Asph
Results
Less than $292,000 est. value
TX

Overlay of Existing Roadway
Results
Less than $2,513,316 est. value
TX

Spot Base Repair
Results
Less than $672,022 est. value
TX

Last Updated 04/29/2020 10:57 AM
Project Title

Conn Brown Harbor Roadway Reconstruction and Hike and Bike Path 2020

Physical Address View project details and contacts
City, State (County) Aransas Pass, TX 78336   (San Patricio County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $7,003,264
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Consist of complete reconstruction of Allen Blvd., Bigelow St., and Turnbough Ave. on Conn Brown Harbor, a total length of 2.225 miles, and a proposed roundabout at the Huff St./Allen Blvd/Bigelow St intersections. The existing roadway will be demolished and rebuilt with new concrete pavement (base bid) with an Additive Alternate (#4) for asphalt concrete (HMAC) pavement consideration. The project scope also includes curb and gutter, ADA compliant curb ramps, signage, pavement markings, and hike & bike path. In addition, the Project includes the following Additive Alternates: AA 1: Rehabilitation of subbase, base and asphaltic concrete overlay of Harbor Point Park Parking Lot AA 2: Extension of existing municipal waterline to provide a continuous looping system AA 3: Added street and pedestrian safety illumination system AA 4: Asphaltic Concrete (HMAC) Pavement, in lieu of Concrete Pavement (Base Bid)

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents