Similar Projects
$160M LRD Metal Fabrication, Refurbishment, and Installation Multiple Award Task Order Contracts (MATOCS)
Renovation
Design
$5,000,000 to $20,000,000 est. value

Facility Repair & Renewal (FRR) (MATOC) Phase 1
Post-Bid
Less than $450,000,000 est. value
Washington, DC

Secure Construction SATOC
Post-Bid
$100,000,000 est. value
Washington, DC

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Results
$3,000,000 to $15,000,000,000 est. value

D/B Southeast MATOC - Phase 2
Results
$1,000,000 to $170,000,000 est. value

Lee County Emergency Management Office Addition
Addition - 12,572 SF
Construction
Opelika, AL 36801

New Regional Center
New Construction - 7,856 SF
Construction
$2,253,200 est. value
Opelika, AL 36801

Sources Sought for Job Opportunity Construction Contracts
New Construction
Post-Bid
$2,000 est. value

Access Control Point Program Design Build II -- RFI(2)
Results

USPS IQ JOC - Alabama
Renovation
Post-Bid
$10,000 to $10,000,000 est. value

Construction Services Performed on AJW-242 Unstaffed Infrastructure Sustainment (UIS) Facilities On and Off Airport Operating Areas
Results
Less than $150,000,000 est. value

Defense Health Agency - Medical Facility Operations and Maintenance
Post-Bid
$2,500 to $90,000,000 est. value

SB Fuels Multiple Award Task Order Contract (MATOC)
Results
Less than $349,000,000 est. value
Washington, DC

USCG National Multiple Award Construction Contract (NMACC III)
New Construction, Renovation, Addition
Post-Bid

Civil Construction Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Contracts
Results
$250,000 to $5,000,000 est. value

Reported 06/18/2022 12:00 AM
Project Title

Facilities Upgrades and Infrastructure Improvement Projects

Physical Address View project details and contacts
City, State (County) Auburn, AL   (Lee County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Accepting Qualifications, Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $1,500,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Auburn School Committee and may include any or all of the following: a. Retrofit and installation of ventilation and/or heating and air conditioning systems. b. Electrical system upgrades. c. Retrofit and installation of new state of the art lighting systems. d. Facilities Master Planning. e. Comprehensive Facilities Audit; f. Building envelope upgrades (weatherization, window upgrades and roof upgrades). g. Retro Commissioning and upgrades of existing HVAC Systems. h. Financing. i. Financial guarantees. j. Building control system upgrades. k. Other energy conservation or cost savings measures as determined feasible. COA may alter or amend this Scope of Work at its' sole discretion at any time prior to executing a contract with the contractor or contractors selected. Once a contract is executed, the Scope of Work may be amended in accordance with the contract documents.

Details

Misc. Buildings, Renovation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents